Laserfiche WebLink
Transit Mix Concrete Co. <br /> _ t <br /> ~ l' - --- <br /> A� <br /> i <br /> i <br /> .a: <br /> � A <br /> Figure G-213 <br /> LTC-2 Surface Water Monitoring Station, July 25, 2017 <br /> Instantaneous streamflow measurements are summarized in Table G-1. Due to dry conditions <br /> at LTC-1 during the November 16, 2015 visit, streamflow was measured approximately 1/3 of a <br /> mile upstream where flow was present. Streamflow was also measured on April 12, 2016 and <br /> June 22, 2016 at the upstream location. The transducer was moved to this upstream location <br /> on April 14, 2016 due to the Glen Carin headgate located immediately downstream from the <br /> original LTC-1 location having work done to it resulting in ponding at the location. <br /> Hitch Rack Ranch Quarry Permit Application <br /> March 9, 2018 G-8 <br />