Laserfiche WebLink
SSGM <br /> www.sgm-inc.com <br /> Total Seed 24#/acre (Drill seeding) All other seeding methods will need to <br /> double this seeding application rate. <br /> The seeding will be performed using hydro seeding, hand broad casting and drill seeding. All seeding <br /> operations area to take place in the time frame between September 15 to April 15. <br /> On the Reclamation Plan Update map, we have identified four separate areas of treatment that are to <br /> be employed to this site to enhance potential success in revegetation in the areas deemed deficient <br /> from our May survey of the site. These areas are noted as follows: <br /> 1. SR- Surface Roughening- to consist of raking, plowing, discing or micro-pocketing using hand <br /> tools or by mechanical means based upon the area of question and accessibility. The purpose of <br /> this will be to eliminate observed rills in the slopes identified,trap sediment, increase infiltration <br /> and to aid in the establishment of vegetative cover. The surface roughening will be performed <br /> to create horizontal ridges and depressions across the slope. Following the surface roughening, <br /> soil treatment will be added at the rate of 4,000 Ibs/acres of Triganics,2,000 Ibs/acre of Sulphur, <br /> 3,000 Ibs of Richlawn 3-6-3 with Mycorrihiza and Humates, 2 gallons per acre of Quantum <br /> Growth Light and 2 gallons per acre of Quantum Growth VSC. Subsequently the slope will be <br /> hydro seeded at 48#/acre with the Generic Seed Mix identified on the Reclamation Plan Update <br /> for 2018 Map. Eco-Flex will be followed at 3,500 Ibs per acre to provide erosion control and <br /> amendment cover. <br /> 2. HB-Hand Broadcasting- to consist of broadcasting the previously referenced Generic Seed Mix <br /> at a rate of 48#/acre using a hand spreader(This is double the rate for drill seeding). The areas <br /> identified for this treatment are areas that are almost deemed acceptable for release. Using <br /> equipment to prep the intermittent bare soil areas will likely damage vegetation currently <br /> deemed acceptable. Prior to hand broadcasting, hand raking those areas to receive hand <br /> broadcasted seed shall be performed to break up the "crust" on the soil followed by an <br /> application of 18-46-00 fertilizer to the bare soil areas at a rate of 300#/acre. <br /> 3. TR- Terrace Repair- to consist of repair of the existing corrugations on the hillside along with <br /> surface roughening of slopes into and out of the corrugations. The objective of the surface <br /> roughening will be to remove the crust on the surface of the soils, and to provide more "micro- <br /> pocketing" of slopes in anticipation of receiving a soil treatment that will be added at the rate of <br /> 4,000 Ibs/acres of Triganics, 2,000 Ibs/acre of Sulphur, 3,000 Ibs of Richlawn 3-6-3 with <br /> Mycorrihiza and Humates, 2 gallons per acre of Quantum Growth Light and 2 gallons per acre of <br /> Quantum Growth VSC. Subsequently the slope will be hydro seeded at 48 #/acre with the <br /> Generic Seed Mix identified on the Reclamation Plan Update for 2018 Map. Eco-Flex will be <br /> followed at 3,500 Ibs per acre to provide erosion control and amendment cover. <br /> GLENWOOD SPRINGS 118 West Sixth St, Suite 200 1 Glenwood Springs, CO 81601 1 970.945.1004 <br />