Laserfiche WebLink
pf COO <br /> . COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> # 876 `x 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> File No.: M- 1983-035 site Name:Vollmer Pit <br /> Co.ty El Paso TR# ��Ims1A <br /> Permittee: Schmidt Construction Company <br /> on <br /> Operator(If Other than Permittee): M-1983-035 - TR01. <br /> . Mark Heffner Complied! INING��ETY ON <br /> Coin lied. <br /> Permittee Representative. NO Violations! <br /> Please provide a brief description of the proposed revi,l tc1, whe, <br /> Expand 10 acre limitation to slightly larger than current affected land; increase bond <br /> accordingly; present possible future reclamation options. <br /> As defined by the Minerals Rules, a Technical Revision(TR)is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time,in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR;however,it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request,including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials,and 112 quarries $216 <br /> 112 hard rock(not DMO) $175 <br /> 110d, 112d(1, 2 or 3) $1006 <br />