My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-13_HYDROLOGY - M2002004
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2002004
>
2018-03-13_HYDROLOGY - M2002004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2021 8:04:08 AM
Creation date
3/13/2018 1:01:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
HYDROLOGY
Doc Date
3/13/2018
Doc Name
Water Monitoring - Groundwater
From
GCC Rio Grande
To
DRMS
Email Name
ERR
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br /> Mr. Edwin Olivares <br /> February 8,2018 <br /> Page 6 <br /> We appreciate the opportunity to work with you on this project. I look forward to discussing any questions <br /> about this report. <br /> Sincerely, <br /> 6", �' C4-., <br /> Bence V.Close <br /> Principal <br /> Attachments: <br /> Figure 1 —Site Basemap <br /> Table I —Summary of Field and Laboratory Water Quality Results <br /> Attachment A—Borehole Logs and Well Construction Forms <br /> Attachment B—Field Water Quality Sampling and Analysis Forms <br /> Attachment C—Laboratory Analytical Reports <br /> REFERENCES <br /> Colorado Department of Public Health and Environment,Water Quality Control Commission,2016. <br /> Regulation No.41,The Basic Standards for Ground Water(5 CCR 1002-41), December 30. <br /> Colorado Department of Public Health and Environment, Water Quality Control Division,Undated. <br /> Suggested Sampling Protocol for Ground Water Monitoring Wells. <br /> Colorado Division of Water Resources,2016. Rules and Regulation of Water Well Construction,Pump <br /> Installation,Cistern Installation,and Monitoring and Observation Hole/Well Construction(2 CCR 402-2), <br /> September 1. <br /> Close Consulting Group LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.