Laserfiche WebLink
e <br /> 4. , GCC <br /> Rio Grande <br /> Pueblo Plant w <br /> fia <br /> March 6 2018 <br /> MAR 13 2019 <br /> Colorado Division of Reclamation, Mining and Safety. DIVISION OF RECLAMATION <br /> Department of Natural Resources MINING AND SAFETY <br /> 1313 Sherman Street, Room 215 <br /> Denver,Colorado 80203 <br /> RE: Groundwater Monitoring Well Installation and Baseline Sampling; MWO06 and MWO07 <br /> Pueblo Cement Plant and Limestone Quarry, File No. M-2002-004 <br /> Mr. Russell, <br /> Please find enclosed documentation of the installation and initial sampling of two (02)groundwater <br /> monitoring wells located down dip of the second mine panel at the GCC Rio Grande, Inc. Pueblo <br /> Limestone Quarry. Installation activities were completed by Close Consulting Group LLC (CCG), and <br /> drilling contractors (Site Services, Inc. and Dakota Drilling, Inc.). The work was completed pursuant <br /> to Technical Revision No. 6 (TR-06), approved by the Colorado Division of Reclamation, Mining and <br /> Safety(DRMS) on July 28, 2017. <br /> GCC will continue to monitor(if samples can be taken) for groundwater well quality. <br /> Should you have any questions/comments, please contact me at (719) 248-4486 or <br /> eolivares@gcc.com. <br /> Sincerely, <br /> P <br /> i-d I win Olivares <br /> Environmental Engineer <br />