My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-09_ENFORCEMENT - M2004031
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M2004031
>
2018-03-09_ENFORCEMENT - M2004031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2021 7:42:04 PM
Creation date
3/12/2018 4:17:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004031
IBM Index Class Name
Enforcement
Doc Date
3/9/2018
Doc Name Note
Hearing Exhibits
Doc Name
Pages 71 - 134
From
Aggregate Industries
To
DRMS
Email Name
JLE
WHE
CMM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' EXHIBIT 26 <br /> area. The Operator failed to minimize the disturbance of ground water mounding to <br /> ' the prevailing hydrologic balance in the surrounding area caused by the Operator's <br /> actions, in violation of section 34-32.5-116(4)(h), C.R.S. <br /> ' 31. By violating section 34-32.5-116(4)(h), C.R.S., the Operator is in <br /> violation of condition 1 of the permit, which requires the Operator to comply with <br /> all applicable requirements of the Act. <br /> 32. Pursuant to section 34-32.5-124(7), C.R.S. the Board may impose a <br /> civil penalty of not less than $100 per day nor more than $1,000 per day for each <br /> day during which a permit violation occurs. The Board may impose a civil penalty <br /> against the Operator based on one hundred forty-five (145) days of violation (from <br /> the October 31, 2014 inspection to the March 25, 2015 Board meeting) at $100 to <br /> $1,000 per day for a civil penalty of$14,500 to $145,000. <br /> ORDER <br /> ' Based on the foregoing findings of fact and conclusions of law, the Board finds <br /> the Operator in violation of section 34-32.5-116(4)(h),C.R.S. for failing to minimize <br /> ' the disturbance to the prevailing hydrologic balance in the surrounding area. <br /> The Board imposes the following CORRECTIVE ACTION against the Operator: <br /> ' A. Submit a Temporary Groundwater Mounding Mitigation Plan <br /> ("Temporary Plan") to the Division within thirty (30) days of the effective <br /> date of this Order. The Temporary Plan shall be submitted in an <br /> approvable form as a Technical Revision. Implementation of that <br /> Temporary Plan shall commence within five (5) days of Division's approval <br /> ' of the Technical Revision. <br /> B. Submit a Permanent Groundwater Mounding Mitigation Plan <br /> ("Permanent Plan") to the Division no later than ninety (90) days after the <br /> effective date of this Order. The Permanent Plan shall be submitted in an <br /> approvable form, as either a Technical Revision or a permit Amendment. <br /> ' Implementation of that Permanent Plan shall commence within thirty (30) <br /> days of Division approval. <br /> The Board imposes a CIVIL PENALTY for one hundred forty-five (145) days <br /> of violation at seven hundred fifty dollars ($750) per day for a total civil penalty-of <br /> $108,750. All but $10,000 of the civil penalty is suspended if the Operator complies <br /> ' with the corrective actions in the time specified. The portion of the civil penalty not <br /> suspended, $10,000, shall be due and payable within thirty (30) days of the effective <br /> ' Aggregate Industries—WCR, Inc. <br /> M-2004-031 <br /> ' W-2015-003 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.