My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-12_REVISION - M2011014
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2011014
>
2018-03-12_REVISION - M2011014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 12:24:11 PM
Creation date
3/12/2018 4:17:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011014
IBM Index Class Name
REVISION
Doc Date
3/12/2018
Doc Name
Request For Surety Release
From
Dale & Ellen Schmidt
To
DRMS
Type & Sequence
SL1
Email Name
LJW
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE <br /> JE <br /> P.O. Box 3471 Rapid City, SD 57709-3471 PO Box 88 Cortez, CO 81321-0088 (605)348-0244 <br /> 198N 200E Unit#1 Moab, UT 84532-2411 (605)939-0650 <br /> WASTELINE6@aol.com <br /> 7 March 2018 <br /> Mr. Lucas West, Environmental Protection Specialist <br /> Colorado Division of Reclamation Mining and Safety <br /> 1313 Sherman Street Room 215 <br /> Denver, CO 80203 <br /> Subject: Schmidt Site, 355 River Run Drive, Aspen Springs, Archuleta County(Reclamation Permit <br /> M2011-014) <br /> Reference: Letters of 5th Sept, 2014 and 6th March, 2018 (attachments 1 and 2) <br /> Dear Lucas: <br /> As you, the Schmidts and I have discussed, the Schmidts would like to obtain reclamation release and <br /> termination of Reclamation Permit M2011-014 from the Division, with the understanding that Archuleta <br /> County will regulate the work which needs to be done on the property, which is now construction work. <br /> A quick review of the situation. In 2011, the Schmidts began excavating and leveling sites on the property <br /> to have sites for a residence, an earth-sheltered workshop/storage building, and outdoor parking and <br /> storage with a connecting road. Because they had significant excess material (soil and borrow(earth)), <br /> he used that for his landscaping business and to people needing fill and soil. A complaint was filed with <br /> CDRMS which required them to obtain a mining and reclamation permit from the state, as well as county <br /> approval, including the CUP approved by the referenced 2014 letter. He has done enough excavation <br /> and site preparation that he no longer needs to remove material from the property. Your last inspection <br /> determined that the reclamation permit can be terminated provided that the County will verify that it will <br /> continue to oversee the work remaining to prepare the site, and of course, install/erect buildings and <br /> structures. <br /> The Schmidts have asked me to coordinate this, include it in the annual report (which I am doing for <br /> them), and have requested the verification from the County that the 2014 CUP still applies (attachment 2). <br /> When that is verified, I will request termination of the state permit. <br /> This letter with attachments will be attached to the 2018 annual report. Please call or email me with any <br /> questions. Thank you for your assistance! <br /> Sincerely, <br /> Nathan A. Barton, CE, PE, DEE, Comptroller, <br /> WASTELINE, INC. (Project Engineer) <br />
The URL can be used to link to this page
Your browser does not support the video tag.