Laserfiche WebLink
' EXHIBIT 14 <br /> Orr Drain Construction/Operation Timeline <br /> 11/23/2016 Aggregate Industries' contractor mobilizes equipment onto the site to construct <br /> Orr Drain improvements after approval at October 26, 2016 MLRB hearing <br /> 12/2/2016 MLRB issues Order granting Aggregate Industries amendment application (AM- <br /> 01) for construction of the Orr Drain <br /> —8/25/2017 Orr Drain substantially complete; Drain gate opened <br /> 9/22/2017 Orr Drain 100%complete after replacement contractor re-grades inlet area to <br /> increase the depth and flow for better drainage <br /> ' 10/27/2017 Fulton Ditch opens Bull Seep turnout diverting Bull Seep flow onto property <br /> adjacent to Orr property. Aggregate Industries closes Orr Drain gate <br /> 2/13/2018 Fulton Ditch closes Bull Seep turnout onto property in order to start filling <br /> ' Denver Water Reservoir <br /> 2/16/2018 Aggregate Industries opens Orr Drain gate; water level of pond behind Drain is <br /> 5.75 ft as measured at gate prior to opening and drops to 0.3 feet 48 hours later <br /> 3/1/2018 Fulton Ditch re-opens Bull Seep turnout on to property <br /> 3/2/2018 Fulton Ditch closes Bull Seep turnout; Orr Drain gate remains open <br />