Laserfiche WebLink
MINED LAND RECLAMATION BOARD HEARING <br /> ' March 21-22, 2018 <br /> (Aggregate Industries - Hazeltine Mine M-2004-031) <br /> Aggregate Industries' Hearing Exhibits <br /> 1 Photos—Drain Valve Fulton Ditch(2) March 13,2015 <br /> ' 2 Photo—Fulton Ditch CMP drain March 13, 2015 <br /> 3 Photo—Water releases from Fulton Ditch Undated <br /> Discharge <br /> 4 Photo— Bull Seep discharge into Fulton Ditch January 26, 2018 <br /> 5 Photos— Fulton Ditch turnouts and structures (4) March 1,2018 <br /> 6 Photos—Orr Drain improvements (3) February 16,2018 <br /> ' 7 Photos— Before and after opening of Orr Drain (3) February 16,2018 and <br /> March 3, 2018 <br /> 8 Photos— Orr Drain current operation (5) March 6, 2018 <br /> 9 Photo— Orr Drain gate March 6, 2018 <br /> 10 Photo— Monitoring well access March 6, 2018 <br /> ' 11 Photo— Groundwater drain on east side of Fulton March 6, 2018 <br /> Ditch <br /> 12 Photo— Discharge of pumped water back to Bull October 17, 2017 <br /> Seep <br /> 13 Photos— Orr Drain measuring devices (2) March 6, 2018 <br /> 14 Orr Drain Construction/Operation Timeline <br /> ' 15 Aerial Photo—Fulton Ditch Discharges March 31, 2006 <br /> 16 Hazeltine Reclamation Aerial Image <br /> 17 Adams County Map—Pipe Discharge Location <br /> Aerial <br /> 18 Tetra Tech Hazeltine Mine Existing Conditions <br /> Map <br /> 19 Bull Seep Topographic Map November 2, 2016 <br /> 20 Cross Section (Fulton Ditch to Orr Drain) <br /> 21 Orr Drain As-Built Drawings October 13, 2017 <br /> 22 Tetra Tech response to Prelim. Adequacy Review June 16, 2016 <br /> 23 Mining Permit Boundary Map <br />