Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br /> Annual Reclamation Report for the Year Zo/� <br /> mine name permit# Permittee <br /> Address: Z2 D V.3 $ !✓R-s Gl�It/ S 60-71 S1� >r Z)P�✓e M- <br /> , (,a �� �—/O <br /> This report, required by RWe 2.04.13,is due by February 15 of each year,or other date,as agreed upon <br /> by the Division. It should include tent, discussion,and maps, at a minimum, in addition to any other <br /> reclamation monitoring data as required by the approved permit. The location of the acreage reported <br /> under each land status category and year of seeding(if applicable)should be clearly and accurately <br /> identified on a map included with the report. <br /> Last Years This Calendar <br /> Land Status Category Cumulative Total Year Cumulative Total ' <br /> Acres disturbed + D = '5__ <br /> Acres backfilled and graded + <br /> Acres to sailed ' �' +T _ <br /> Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br /> each category below. Do not include acres that have achieved final, Phase III release_ <br /> Last Year <br /> This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total ear Total' less years ' <br /> Acres seeded* Ir + V_ = S = -5—___ + <br /> *include, if necessary,a description of any augmented seeding or cultural practices <br /> For the Entire Life of Mine,the total number of acres disturbed_�and the total number of acres: <br /> Phase I released Al/A Phase 11 released Phase III released <br /> For Mines in Permanent Cessation: <br /> Total acreage in facilities subject to reclamation but yet to be completed <br /> For Government Performance and Results Act <br /> Acreage in long-term mining or reclamation facilities <br /> Acreage in active mining areas 3 O <br /> r(exclude acres where Phase III release has been achieved) <br /> 2 Includes haul and access roads,temporary dams and impoundments;permanent dams and impoundments;diversion and <br /> collector ditches,water and air monitoring sites;topsoil stockpiles;overburden stockpiles;repair,storage and construction areas; <br /> office area,repair shops,and parking,coal stockpiles,loading,and processing areas;railroads;coal conveyors,nonbackfilled and <br /> graded areas of refuse piles,coal mine waste impoundments,head-of-hollow fills,and valley fills;ventilation shafts and entryways; <br /> and noncoal waste disposal area(garbage dumps and coal combustion by-products disposal areas). <br /> 3 Includes pits,topsoil stripped areas in advance of pits,and spoil not backfilled and graded <br />