Laserfiche WebLink
3/12/2018 Stam.counExecutive Branch Mail Fwd: Bowie renewal permit n7—C1em000 <br />COLORADO <br />Division of Reclamation, <br />hIL7 Miring and Safety <br />Department mmamralResources <br />P3038663567x8144 1 F303.832.8106 <br />131]Sherman Street, Room 215, Denver, CO 80203 <br />dayton.wein@state.no.ue I http://mining@sbaba.co.um <br />On Thu. Mar 8, 2018 at0:O2AM, Wein ' DNR, Clayton <clmyton.wein@ebete.co.us> wrote <br />Hi Judy, <br />Attached ioMap 8. <br />Clayton Wein <br />Environmental Protection Specialist <br />COLORADO <br />Division of Reclamation, <br />J&17 Mining and Safety <br />Department mmamralResources <br />P303860.3567x8144 1 F303.832.8106 <br />1313Sherman Street, Room 215, Denver, CO 80203 <br />dayton.sein@state.00.ua I http://mining@atate.00.ua <br />On Thu, Mar 8, 2018at9:01 AM, VVein' DNR, Clayton <cIeyton.vvein@state.cm.um>vvrote: <br />Good Morning Judy, <br />Attached are copies of the proposed revised pages from Bowie's RN -7 adequacy response. The Division io <br />currently still in the adequacy process and the attached documents are not yet approved to be the final copies. <br />The Division's second adequacy review letter will be up on our imaging system within the next couple of days. The <br />PDFs for the maps may have to be sent to you over a few emails, the files are larger in size than the text files. <br />Please feel free tocontact meifyou have any questions. <br />Sincerely, <br />Clayton Wein <br />Environmental Protection Specialist <br />COLORADO <br />Division of Reclamation, <br />J&17 Mining and Safety <br />Department mmamralResources <br />P303066.3567x8144 1 F303.832.8106 <br />1313 Sherman Street, Room 215, Denver, CO 80203 <br />deyton.woin@ata1e. co.us I http:0mining@sta1e.co.us <br />On Wed, Mar 7, 2018 at 12:07 PK4. Judy Martin <judykoh|ermortin@gmai|.00m>vvnoto: <br />I saw on your website a posting of the response dated Feb 28 to the adequacy letter you sent to BRL. The <br />responses to the issues on the Load out reclamation were supposedly addressed in a revision -- updated Vol 7 <br />section 2.05reclamation plan. The Black Bridge Road reconfiguration iasupposedly shown onanew post <br />mining land use Map 8A. <br />Neither ofthese documents are shown inyour imaged data records. Could you send them homoseparately? <br />Additionally, in response to a timeline and updated reclamation cost estimate for the Paonia Load out, these are <br />supposed in the new reclamation pond pages which were sent to you to be inserted into Volume 7, Tab 3.05. <br />1 would like access to those documents either on your website or sent to me separately. <br />mtpm:llma.0oogle.00m/mmiVb/AHud4r1wz8h6URBSvLUY34buwJoFu H4nDa/u/0/?ui~u&k=dob7fOoduO&mm=xsTogxP»gMA.o— 2/3 <br />