My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-09_PERMIT FILE - M2017049 (27)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017049
>
2018-03-09_PERMIT FILE - M2017049 (27)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2021 12:00:44 AM
Creation date
3/9/2018 3:45:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017049
IBM Index Class Name
PERMIT FILE
Doc Date
3/9/2018
Doc Name Note
PART 2 OF 3
Doc Name
Adequacy Review Response
From
Transit Mix Concrete Co.
To
DRMS
Permit Index Doc Type
Application Materials
Email Name
TC1
ERR
ECS
WHE
AME
PSH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transit Mix Concrete Co. <br /> Reclamation Quantities and Phasing <br /> Reclamation will occur contemporaneously as mining progresses and as areas become available for material placement and <br /> closure. Areas, estimated volumes of mined material and salvageable topsoil are shown on Table D-1 and Table D-2 in Exhibit D. <br /> Table E-1 Reclamation Areas by Affected Land Type <br /> Highwall Highwall Total Topsoil Fines Mining Total <br /> Pit Floor ' Backfill Mining Plant Roads z Related <br /> (acres) Bench Slope Stockpile Area (acres) (acres) Stockpile Stockpile Area Area <br /> (acres) (acres) (acres) (acres) (acres) (acres) (acres) <br /> Phase 1 0 0 0 0 0 0 20.57 0 0 0 20.57 <br /> Phase II 0 1.78 2.20 0.00 3.97 0 0 0 0 0 3.97 <br /> Phase III 0 0 0 7.95 7.95 0 0 0.77 10.58 0 18.54 <br /> Phase IV 0 0 0 2.77 2.77 0 0 0 0 0 2.77 <br /> Phase V 0 6.72 8.31 13.65 28.68 0 0 0 0 0 28.68 <br /> Phase VI 28.41 3.98 4.92 47.99 85.29 12.35 16.65 3.88 3.40 59.17 164.50 <br /> Total 28.41 11.53 1 14.27 73.71 128.66 1 12.35 1 37.22 4.66 13.98 59.17 239.03 <br /> The highwall slopes will be reclaimed as rock outcroppings, and these areas will not be revegetated. <br /> 'There will be approximately 12.90 acres of highwall that are covered by fines stockpiles and reclaimed as vegetated slopes <br /> 2 The plant and topsoil stockpiles are wholly within the total mining and topsoil stockpile areas, and the reclamation areas associated with the <br /> plant and topsoil stockpiles are included in these other areas. <br /> Hitch Rack Ranch Quarry Permit Application <br /> March 9, 2018 E-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.