My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-09_REPORT - C1982056 (3)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1982056
>
2018-03-09_REPORT - C1982056 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2018 11:42:25 AM
Creation date
3/9/2018 11:27:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Report
Doc Date
3/9/2018
Doc Name
Annual Hydrology Report
From
Twentymile Coal, LLC
To
DRMS
Annual Report Year
2017
Permit Index Doc Type
Hydrology Report
Email Name
TNL
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
326
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Subsidence, tilt and strain magnitude at each Archer -Hayden and Craig -Hayden -Steamboat structure are <br />predicted to be lower than previously experienced by WAPA's line that crossed the Eastern Mining <br />District and by these two lines when they were previously undermined by 19 -Right in the Northern <br />Mining District. <br />8.5. Water Wells <br />The evaluation presented in Section 7 predicts impacts to wells completed in the Wolf Creek Seam and its <br />immediate overburden. Minor impacts may also occur in shallow overburden wells but are likely to be minor <br />with recovery within one year after undermining. <br />8.6. Monitoring Requirements <br />As noted in the introduction, Twentymile Coal, LLC has collected and submitted a large amount of subsidence <br />data from monitoring coal extraction in the Wadge Seam. They have also monitored subsidence of the Power <br />Lines, Fish and Foidel Creek and the Energy Spur railroad track during sequential undermining. We recommend <br />that monitoring both ground subsidence and structure response continue focusing on verifying the predictions <br />made herein. Additional monitoring requirements associated with each of the evaluated structures <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.