Laserfiche WebLink
PeabjLGY <br />February 21, 2018 <br />Jason Musick <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: HGT AHR, Permit C-92-081 <br />Dear Jason, <br />Hayden Gulch Terminal, LLC <br />Peabody Energy <br />PO Box 670 <br />36600 Routt County Road 27 <br />Hayden, CO. 81639 <br />Misr; U U Z� 13 <br />DIVISION OF RECWAATIONN <br />II,IN' SN0AND SAFETY <br />Enclosed is the 2017 Annual Hydrology Report (AHR) for the Hayden Gulch Terminal Loadout <br />(HGT). This report contains a compilation and analysis of hydrologic data collected during the <br />period extending from October 1, 2016 through September 30, 2017. <br />Please contact me with any comments and/or questions. <br />Sincerely, <br />Miranda Kawcak <br />Engineering Technician, Environmental <br />TNS//ns <br />Enclosure: HGT AHR <br />cc: Alan Boehms, OSMRE <br />Jennifer Maiolo, BLM <br />