Laserfiche WebLink
Peabody Sage Creek Mining, LLC <br />Permit No. 1OR01175 <br />Initial Approval -Modification 1 Colorado Department of Public Health and Environment <br />page 11 Air Pollution Control Division <br />PARTICULATE EMISSIONS CONTROL PLAN FOR MINING AND PROCESSING ACTIVITIES <br />THE FOLLOWING PARTICULATE EMISSIONS CONTROL MEASURES SHALL BE USED FOR COMPLIANCE <br />PURPOSES ON THE ACTIVITIES COVERED BY THIS PERMIT, AS REQUIRED BY THE AIR QUALITY <br />CONTROL COMMISSION REGULATION NO.1, SECTION IIID 1.b. THIS SOURCE IS SUBJECT TO THE <br />FOLLOWING EMISSION GUIDELINES. <br />a. Mining and Processing Activities - Visible emissions not to exceed 20%, no off -property transport of visible <br />emissions. <br />b. Haul Roads - No off -property transport of visible emissions shall apply to on-site haul roads, the nuisance <br />guidelines shall apply to off-site haul roads. <br />c Haul Trucks - There shall be no off -property transport of visible emissions from haul trucks when operating <br />on the property of the owner or operator. There shall be no off -vehicle transport of visible emissions from the <br />material in the haul trucks when operating off of the property of the owner or operator. <br />Control Measures <br />1. Adequate soil moisture must be maintained in topsoil and overburden to control emissions during removal. <br />Watering shall be implemented if necessary. <br />2. Topsoil and overburden stockpiles shall be revegetated within one year after complete buildout. <br />3. Waste rock stockpiles shall be reclaimed per Division of Reclamation and Mine Safety regulations. <br />4. Emissions from material handling (i.e. removal, loading, and hauling) shall be controlled by watering at all <br />times unless natural moisture is sufficient to control emissions. <br />5. Unpaved haul roads shall be graveled, as per initial application, and watered as often as needed to control <br />fugitive particulate emissions such that the above guidelines are met. <br />6. Material stockpiles shall be watered as necessary to control fugitive particulate emissions. <br />7 Plant entryway, haul roads and truck service roads, shall be graveled. Watering shall be implemented if <br />emission guidelines above are not met. <br />AIRS ID: 107/0098 Page 11 of 11 <br />