Laserfiche WebLink
RULE 2 - PERMITS <br />• Boom Truck and Fork Lifts <br />• Utility Trucks and Light Vehicles <br />• Air Compressor <br />• Welders <br />• Generators <br />• Light - Plants <br />• Pumps <br />Operation Description <br />The proposed mine development, and any subsequent mine production operations will be <br />underground only and will involve no surface mining activities. The underground mining <br />operations are described in general terms in Section 2.05.2, and in greater detail in the preceding <br />portions of this section. Areas affected by mining and related operations are on Map 2.05.3 -M1A, <br />Mine Facilities Map (South End), Map 2.05.3 -M1B, Mine Facilities Map (North End), and Map <br />2.05.3 -M1, Life of Mine Plan Map. Any future coal exploration programs necessary to delineate <br />and characterize the coal seam(s) and strata above and below the coal seam will be designed and <br />permitted in compliance with applicable provisions of Rules 2.02 and 4.21. <br />Surface Facilities <br />The location of proposed mine structures and facilities within the PSCM permit area are shown on <br />the Mine Facilities Maps, (Map 2.05.3 -M1A, Mine Facilities Map (South End) and 2.05.3 -M1B, <br />Mine Facilities Map (North End) and their function, use, and maintenance are described in detail in <br />this section. All surface facilities have been or will be designed in compliance with applicable <br />provisions of Rule 4.04 as detailed in the specific facility descriptions. Removal of the mine <br />facilities and reclamation of the associated disturbance areas will be completed in accordance with <br />the reclamation plans described in Section 2.05.4. <br />Proposed mine structures and facilities are described in the following sections. Dimensions and <br />general construction information for all mine facilities are provided in the following discussions in <br />compliance with applicable regulatory provisions and as the basis for estimating mine closure and <br />reclamation costs. <br />Existing support facilities are located in the northern end of the surface disturbance area as shown <br />on Map 2.05.3 -M1B, Mine Facilities Map (North End). These facilities are comprised of <br />remaining structures from the former Seneca II Mine. All facilities will be removed, and the <br />associated disturbance areas reclaimed to approximate original contours, and the approved <br />postmining uses when no longer required to support ongoing or future mining and related activities. <br />The northern surface facilities include: <br />• Vehicle Maintenance Shop <br />• Parts Building <br />• Electrical Parts Building <br />• Lean -to Building <br />• Welding Shop <br />• P.M. Shop <br />TR -01 -10 2.05 -10 Revision 02/11 <br />