Laserfiche WebLink
List of Figures (continued) <br />Figure 2.04.11-F 1 Winter Big Game Densities within the Combined Seneca I1 and Yoast Mines' <br />PSCM Permit App. TOC -iv Revision 03/05/10 <br />Big Game Survey Areas from 2000-2007 and the Peabody Sage Creek Mine <br />Big Game Survey Area in 2009............................................................ <br />2.04-152 <br />Figure 2.05.3-F1 <br />Typical Haulroad Cross-Section.............................................................2.05-24 <br />Figure 2.05.3-F2. <br />Typical Access Road Cross-Section........................................................2.05-26 <br />Figure 2.05.4-F1 <br />Typical Portal Seals.............................................................2.05-60 <br />Figure 2.05.6-F 1 <br />Modeled Initial Drawdown and Mining Sequence..................................2.05-72 <br />Figure 2.05.6-F2 <br />Predicted Groundwater Inflow Rates 0-420 Months...............................2.05-74 <br />Figure 2.05.6-F3 <br />Graph of Predicted Drawdown Resulting from Mine Dewatering .......... <br />2.05-76 <br />Figure 2.05.6-F4 <br />Predicted Drawdown 26 Months after Start of Mine Dewatering .......... <br />2.05-77 <br />Figure 2.05.6-F4.1 <br />Predicted Drawdown 60 Months after Start of Mining .................. <br />2.05-77.1 <br />Figure 2.05.6-F4.2 <br />Predicted Drawdown 420 Months after Start of Mining ................. <br />2.05-77.2 <br />PSCM Permit App. TOC -iv Revision 03/05/10 <br />