My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-01-31_PERMIT FILE - C2009087
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2009087
>
2018-01-31_PERMIT FILE - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2018 8:18:27 AM
Creation date
3/9/2018 8:12:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Permit File
Doc Date
1/31/2018
Doc Name
Table of Contents
Section_Exhibit Name
Table of Contents
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />U <br />�J <br />2.04.12 Prime Farmland Investigation..................................................................2.04-173 <br />2.04.13 Annual Reclamation Report.....................................................................2.04-174 <br />2.05 Operation and Reclamation Plans........................................................................................2.05-1 <br />2.05.1 <br />Objectives....................................................................................................2.05-2 <br />2.05.2 <br />Operation Plan — Estimated Area for Life of Operation .............................. <br />2.05-3 <br />2.05.3 <br />Operation Plan — Permit Area ............................ .......................................... <br />2.05-7 <br />2.05.4 <br />Reclamation Plan.......................................................................................2.05-34 <br />2.05.5 <br />Postmining Land Use.................................................................................2.05-62 <br />2.05.6 <br />Mitigation of the Impacts of Mining Operations ....................................... <br />2.05-63 <br />2.05.6 (1) Air Pollution Control Plan................................................................. <br />2.05-63 <br />2.05.6 (2) Fish and Wildlife Plan.......................................................................2.05-64 <br />2.05.6 (3) Protection of Hydrologic Balance.........................................2.05-68 <br />2.05.6(3)(a) Protection of the Hydrologic Balance................2.05-68 <br />2.05.6(3)(a)(iii) Probable Hydrologic Consequences <br />.... 2.05-69 <br />2.06 Special Categories of Mining..............................................................................................2.06-1 <br />2.06.1 Scope............................................................................................................2.06-1 <br />2.06.6 Prime Farmlands..........................................................................................2.06-1 <br />2.06.7 Variances for Delay in Contemporaneous Reclamation Requirements in <br />Combined Surface and Underground Mining Operations ........................... 2.06-1 <br />2.06.8 Surface Coal Mining and Reclamation Operations on Areas, or Adjacent to <br />Areas, Including Alluvial Valley Floors ......................................................2.06-1 <br />2.06.10 Coal Processing Plants and Support Facilities Not Located Within the Permit <br />Area.............................................................................................................. 2.06-1 <br />Rule 3 - Performance Bond Requirements <br />3.01 Introduction.................................................................................................................... 3.0-1 <br />3.02 Performance Bond Requirements for Surface Coal Mining and Reclamation Operations ...3.0-1 <br />3.02.1 General Requirements.................................................................................... 3.0-1 <br />3.02.2 Determination of Bond Amount.................................................................... 3.0-1 <br />3.02.3 Period of Liability for Performance Bond ..................................................... 3.0-2 <br />3.02.4 Form, Conditions, and Terms of Performance Bonds...................................3.0-2 <br />Rule 4 - Performance Standards <br />4.01 General Provisions .................................... <br />4.01.1 Scope and Objectives........ <br />4.01.2 Authority ........................... <br />4.01.3 Responsibility ................... <br />PSCM Permit App. <br />.......................................................................... 4.0-1 <br />.......................................................................... 4.0-1 <br />..........................................................................4.0-1 <br />..........................................................................4.0-1 <br />TOC -ii <br />Revision 03/05/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.