Laserfiche WebLink
Colorado Mined Land Reclamation Board <br /> Page 3 <br /> March 2, 2018 <br /> Office of Archaeology and Historic Preservation(History Colorado) 10/17/2017 <br /> Army Corps of Engineers 10/3/2017 <br /> Un-timely Commenting Agency: <br /> Agency Date Comment Received <br /> Colorado Parks and Wildlife 3/1/2018 <br /> Parties Who Have Withdrawn: <br /> Date Withdrawal <br /> Person or Entity Form Received <br /> Pia Jensen 2/23/2018 <br /> The Division forwarded copies of all comments to the Applicant and scheduled the application for a <br /> hearing before the Colorado Mined Land Reclamation Board(the Board) and a Pre-hearing Conference. <br /> The Division provided notice of the scheduled Board hearing and Pre-hearing Conference to all parties <br /> and interested persons. Due to the timely objections, on the decision date the Division would not make a <br /> decision on the application,but rather a recommendation to the Board. <br /> During the review period the Division generated four adequacy letters. The Applicant addressed all <br /> adequacy issues to the Division's satisfaction. Therefore, on March 2,2018,the Division determined the <br /> application to have satisfied the requirements of Section 34-32.5-115(4) C.R.S. and issued its <br /> recommendation to approve the application with the following conditions: <br /> I. No less than 60 days prior to exposing groundwater and/or initiating dewatering operations, LRM <br /> shall submit to the Division the results of the baseline water quality monitoring. The results shall <br /> include an analysis of the water quality and a discussion of any exceedances of the table value <br /> standards for the analytes evaluated within the approved water monitoring plan. <br /> II. When the Operator has completed mining in each mine phase,they shall submit to the Division <br /> an as-built or record of drawing(s)certified by a professional engineer registered in the State of <br /> Colorado of the clay liner and perimeter drain for each phase of the operation(Phases 1 through <br /> 5). The registered professional engineer certification must demonstrate the liner and drain were <br /> installed to the required specifications. The registered professional engineer certified as-built or <br /> record drawing(s) shall be submitted the Division not less than 60 days prior to initiating mining <br /> in the next or subsequent phase. <br /> Pursuant to Rule 1.4.1(12), a condition or limitation to approval of the application,unless consented by <br /> the Applicant, shall be treated as a denial. Therefore, if the Applicant rejects any of the following <br />