My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-20_PERMIT FILE - M2017036
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017036
>
2018-02-20_PERMIT FILE - M2017036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2018 9:58:48 AM
Creation date
3/8/2018 8:03:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017036
IBM Index Class Name
Permit File
Doc Date
2/20/2018
Doc Name Note
Adequacy Review #4
Doc Name
Adequacy Review Response
From
Telesto
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To:Jared Ebert <br /> Date: February 27,2018 <br /> Page 8 <br /> cost to spread three feet of overburden and soil (growth media) over the affected land <br /> acreage. Also, the Division will hold enough money to revegetate this amount of affected <br /> land. <br /> The pumping cost included with the estimate only included the cost for the electricity to <br /> run the pump. This cost does not include all the factors that contribute to costs the <br /> Division would incur to pump down the pit. Please see the Division's estimate for <br /> details. <br /> Please let the Division know if you have any addition questions or ifyou concur with the <br /> estimate for the Phase 1 area. Also please address the following issue: <br /> a. Based on the Appendix 6 document, the source of material used to construct the <br /> clay liner is overburden material and fines. Please demonstrate that this material <br /> when compacted will be adequate to act as the proposed impermeable clay liner. <br /> If not,please provide a plan and a cost to obtain the required clay liner material. <br /> b. Telesto Response:LRM concurs with the cost estimate for the Phase 1 area. LRM <br /> is in the process of conducting compaction and permeability tests with the fine <br /> material from the Knox Pit site. The results are expected on February 16 and will <br /> be provided to your office on February 20, 2018. <br /> c. DRMS Response: To date the Division has not received this information. This <br /> item remains outstanding <br /> Response 46c <br /> LRM completed compaction and permeability tests with the overburden materials from <br /> the Knox Pit. A preliminary calculation set was provided to DRMS on February 23, <br /> 2017. Attachment 2 provides the final results of the compaction testing and leakage <br /> analysis showing that site materials will meet permeability requirements and the liner can <br /> be completed as planned. <br /> RULE 6.4.19 - EXHIBIT S - PERMANENT MAN-MADE <br /> STRUCTURES <br /> Comment 1 <br /> 1. On February 22 and 23, 2018 the Division received a comment (attached)from <br /> an adjacent landowner Jayme Tilley. Mrs. Tilley indicated several additional <br /> structures are located on her property that are not addressed in the application. <br /> Please address the following: <br /> Response to DRMS Adequacy Review 3 comments TELE ST O <br />
The URL can be used to link to this page
Your browser does not support the video tag.