Laserfiche WebLink
5.0 GROUND WATER SAMPLE COLLECTION <br /> Ground water samples will be collected from the existing monitoring well locations <br /> identified on Figure 1 and listed in Table 1. Well completion logs for each monitoring <br /> well are included in Appendix B. <br /> All ground water sampling equipment which will contact the ground water sample will <br /> either be decontaminated following the procedures specified in SOP #1 or be new and <br /> certified clean by the manufacturer. Prior to sample collection, sampler will collect a <br /> water well level measurement per the procedures outlined in SOP #2. Depending on the <br /> monitoring well characteristics, a minimum of three casing volumes will be purged from <br /> each well. Field water quality parameters will be measured during purging, and purging <br /> will continue until the parameters have stabilized. In instances where it may not be <br /> practical to purge three casing volumes, field water quality parameters will be monitored <br /> for stability before the three casing volumes are purged. In general, the monitoring wells <br /> listed in Table 1 are expected to yield sufficient water to allow for three casing volumes <br /> before sampling. <br /> Once field parameters have stabilized and or three well volumes have been removed, <br /> groundwater samples will be collected. Well purging, monitoring of field parameters and <br /> sample collection will be performed in accordance with the SOPs listed above. Field <br /> analytical parameters (which include pH, specific conductivity, temperature) and <br /> groundwater quality parameters to be analyzed are listed in Table 2. Appendix C <br /> provides the sampling analysis, method, containers, preservation and holding times for <br /> each parameter. <br /> 6.0 WATER MANAGEMENT POND SAMPLING <br /> The proposed Water Management Pond (WMP) is an unlined pond and is expected to <br /> directly recharge groundwater in the vicinity. Water samples will be collected quarterly <br /> from the WMP located in the NE corner of the proposed Site. Figure 1 shows the <br /> proposed location of the WMP. The standard operating procedures for sample collection <br /> are outline in SOP# 6. <br /> Loveland Ready-Mix Concrete,Inc. 3 Telesto Solutions,Inc. <br /> 20180227_1m_lapork_g,_sap reN I do February 2018-REV! <br />