My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-20_PERMIT FILE - M2017036
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017036
>
2018-02-20_PERMIT FILE - M2017036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2018 9:58:48 AM
Creation date
3/8/2018 8:03:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017036
IBM Index Class Name
Permit File
Doc Date
2/20/2018
Doc Name Note
Adequacy Review #4
Doc Name
Adequacy Review Response
From
Telesto
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.0 GROUND WATER SAMPLE COLLECTION <br /> Ground water samples will be collected from the existing monitoring well locations <br /> identified on Figure 1 and listed in Table 1. Well completion logs for each monitoring <br /> well are included in Appendix B. <br /> All ground water sampling equipment which will contact the ground water sample will <br /> either be decontaminated following the procedures specified in SOP #1 or be new and <br /> certified clean by the manufacturer. Prior to sample collection, sampler will collect a <br /> water well level measurement per the procedures outlined in SOP #2. Depending on the <br /> monitoring well characteristics, a minimum of three casing volumes will be purged from <br /> each well. Field water quality parameters will be measured during purging, and purging <br /> will continue until the parameters have stabilized. In instances where it may not be <br /> practical to purge three casing volumes, field water quality parameters will be monitored <br /> for stability before the three casing volumes are purged. In general, the monitoring wells <br /> listed in Table 1 are expected to yield sufficient water to allow for three casing volumes <br /> before sampling. <br /> Once field parameters have stabilized and or three well volumes have been removed, <br /> groundwater samples will be collected. Well purging, monitoring of field parameters and <br /> sample collection will be performed in accordance with the SOPs listed above. Field <br /> analytical parameters (which include pH, specific conductivity, temperature) and <br /> groundwater quality parameters to be analyzed are listed in Table 2. Appendix C <br /> provides the sampling analysis, method, containers, preservation and holding times for <br /> each parameter. <br /> 6.0 WATER MANAGEMENT POND SAMPLING <br /> The proposed Water Management Pond (WMP) is an unlined pond and is expected to <br /> directly recharge groundwater in the vicinity. Water samples will be collected quarterly <br /> from the WMP located in the NE corner of the proposed Site. Figure 1 shows the <br /> proposed location of the WMP. The standard operating procedures for sample collection <br /> are outline in SOP# 6. <br /> Loveland Ready-Mix Concrete,Inc. 3 Telesto Solutions,Inc. <br /> 20180227_1m_lapork_g,_sap reN I do February 2018-REV! <br />
The URL can be used to link to this page
Your browser does not support the video tag.