My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-20_PERMIT FILE - M2017036
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017036
>
2018-02-20_PERMIT FILE - M2017036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2018 9:58:48 AM
Creation date
3/8/2018 8:03:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017036
IBM Index Class Name
Permit File
Doc Date
2/20/2018
Doc Name Note
Adequacy Review #4
Doc Name
Adequacy Review Response
From
Telesto
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.0 INTRODUCTION <br /> In September 2017, Loveland Ready Mix (LRM) submitted an application to the <br /> Colorado Division of Reclamation Mining and Safety (Division) to permit the proposed <br /> Laporte sand and gravel operations; "Knox Pit Construction Material Application DRMS <br /> 112", DRMS No. M-2017-036. <br /> As part of the approval process the Division has requested LRM submit a groundwater <br /> quality monitoring plan and sufficient data to determine baseline groundwater quality and <br /> demonstrate the site will be in compliance with CDPHE Water Quality Control <br /> Commission (WQCC) Regulation 41: Basic Standards for Groundwater during the tenure <br /> of the mine and reclamation. <br /> This Sampling and Analysis Plan (SAP)describes the sampling and analysis methods and <br /> monitoring schedule that will be employed for the collection of groundwater quality <br /> samples and water samples from the water management pond at the Loveland Ready Mix <br /> Concrete, Inc. (LRM), Laporte Operations (Site). <br /> The site, monitoring well locations, and water management pond are shown on Figure 1. <br /> Groundwater elevation contours for the area are included in Figure 2. <br /> 2.0 OBJECTIVE <br /> The objective of this SAP is to characterize baseline groundwater quality in the aquifer <br /> underlying the proposed Site (Cache La Poudre Alluvial Aquifer), ensure mining and <br /> reclamation activities at the Site do not degrade existing groundwater quality/uses and <br /> that the water quality collection methods guarantee data quality. The SAP includes: <br /> • Collection of ground water samples <br /> • Collection of water samples from the water management pond <br /> • Collection of ground water quality data <br /> • Documentation of data collection activities <br /> • Analytical methods and detection levels <br /> • Sampling protocols <br /> • Quality Assurance and Quality Control (QA/QC) <br /> Loveland Ready-Mix Concrete.Inc. 1 Telesto Solutions,Inc. <br /> 201e0227_Irm_v ._g.._w_ro I da= February 2018-REV1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.