My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-20_PERMIT FILE - M2017036
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017036
>
2018-02-20_PERMIT FILE - M2017036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2018 9:58:48 AM
Creation date
3/8/2018 8:03:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017036
IBM Index Class Name
Permit File
Doc Date
2/20/2018
Doc Name Note
Adequacy Review #4
Doc Name
Adequacy Review Response
From
Telesto
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TELEST <br /> S O L O T 1 O N S• i N C O R V O R A T E D <br /> February 27, 2018 RECEIVED <br /> FEB 2 L[H <br /> Jared Ebert <br /> DIVISION OF RECLAMATION <br /> Colorado Division of Reclamation, Mining and Safety MINING AND SAFETY <br /> 1313 Sherman Street,Room 215 <br /> Denver,Colorado 80203 <br /> Subject: Knox Pit,DRMS Permit Application No. M-2017-036 <br /> Adequacy Review No. 4 <br /> Dear Mr. Ebert: <br /> Thank you for your review of Loveland Ready-Mix's LaPorte Operations Knox Pit <br /> application. This letter serves as Loveland Ready-Mix's (LRM's) response to the <br /> Adequacy Review 4 Comments from the Division of Reclamation, Mining and Safety <br /> (DRMS), dated February 23, 2018. <br /> LRM acknowledges the application consideration date extension and the Mined Land <br /> Reclamation Board hearing date of March 21 and 22, 2018. LRM will attend the Pre- <br /> Hearing Conference on March 8, 2018 from 10:00 am to 2:00 pm. <br /> RULE 6.4.7 EXHIBIT G - WATER INFORMATION <br /> Comment 39a <br /> Section 7.3.2 of the application claims that "ground water quality is not anticipated to be <br /> an issue. " Exhibit G cites a groundwater study (Telesto, 2017b) that was not submitted <br /> with the application. Has LRM analyzed the baseline groundwater quality? If so, please <br /> provide this data. Please provide a prediction of the probably hydrologic impacts to the <br /> groundwater quality from excavating the alluvial material and exposing the Pierre Shale. <br /> Response 39a <br /> The statement that "ground water quality is not anticipated to be an issue" comes from <br /> three fundamental pieces information: <br /> Response to DRMS comments TELE S T <br />
The URL can be used to link to this page
Your browser does not support the video tag.