Laserfiche WebLink
Other Reclamation Permits held by Prospective Successor(if applicable): Pew" <br /> M 1998084,M2000147, 78357,M2010016,M 1 981243,M 1 980085,M 1991079, <br /> M2002119,M 1 99!!8TM2009078,M2000030,M1999025,M 1980080,M 1979089, <br /> M1 999076W998105,M1987064,M1987044,M1986165,M1979166,M1996034, <br /> M200904�, 1980131 <br /> DESIGNATION OF REVIEW TIMELINE <br /> As explained above, the Permittee and Prospective Successor may waive their right to receive a <br /> decision on an Application within 30 days in order to allow the Division to calculate the required <br /> Financial Warranty before issuing its decision. Permittee and Prospective Successor must initial <br /> one of the following two options to designate their choice. If Permittee and Prospective <br /> Successor cannot agree, the Division will render its decision within 30 days. <br /> I have reviewed the information provided in this Application <br /> Permittee Packet, as well as the applicable Act and Rules. Having been fully <br /> informed, I wish to WAIVE MY RIGHT TO A DECISION ON <br /> Prospective Successor MY APPLICATION WITHIN 30 DAYS. <br /> ` I have reviewed the information provided in this Application <br /> Pe rat' tee A Packet, as well as the applicable Act and Rules. Having been fully <br /> G informed, I wish to MAINTAIN MY RIGHT TO A DECISION <br /> Prospective Successor ON MY APPLICATION WITHIN 30 DAYS. <br /> The Prospective Successor must provide an adequate Financial Warranty or conditional <br /> replacement Financial Warranty, consistent with the designation above. Hard Rock and <br /> Construction Materials Rule 4.3 describes the various acceptable types of Financial Warranties. <br /> Each Financial Warranty must be submitted on the Board's approved forms (available online at <br /> . 'Minerai%2OF�c�rms.litm). <br /> f11tp:,,�ninin�cs 5tate.co.u�- <br /> - 6 - <br />