Laserfiche WebLink
SNOWCAP COAL COMPANY, INC. <br /> Table 13-1 <br /> Permit Area Building and Structure Inventory <br /> ROADSIDE NORTH -PORTAL&SURFACE FACILITIES <br /> Building or Structure Construction Description <br /> Date <br /> Surface Facilities 1980 Showerhouse, change house(trailers and sewage) <br /> Trailers removed in 1995. All other structures removed <br /> 2001. <br /> Shop 1981 800 sq. ft. shop metal building). Removed 2000. <br /> Mine Storage Yard 1979 36,000 sq. ft. storage area, chainlink fence around <br /> perimeter. Removed 2001. <br /> Truck Load-Out 1980 50 ton bin and 36"conveyor for loading trucks (steel <br /> structure) Relocated in 1995 as part of the Truck Load-out <br /> System. Removed 2002. <br /> Evaporation Pond 1980 18,750 sq. ft. evaporation pond for sewage treatment <br /> effluent. Backfilled 2002. <br /> Decline 1979 Decline for access to RSN Mine. Backfilled 2002. <br /> Parking Lot 1980 3/4" gravel base parking lot(60 parking spaces). <br /> Removed 2002. <br /> Light Use Road 2 1977 1/8th mile 1'/2'gravel base light use road. Removed 2002 <br /> and 2008. <br /> Topsoil Storage Area#1 1980 13,800 yards of topsoil. Used in 2012. <br /> Topsoil Storage Area#2 1980 5,200 yards of topsoil. Used in 2012. <br /> Topsoil Storage Area#3 1980 15,100 yards of topsoil. Used in 2002. <br /> Sediment Pond#4 1979 Refer to Section 2.05.3(4)for details. Backfilled in 2002. <br /> Sediment Pond#5 1979 Refer to Section 2.05.3(4) for details <br /> Backfilled in 2002. <br /> Mine Water Treat. Pond 12 1997 Refer to Section 2.05.3(4)for details <br /> Backfilled in 2002. <br /> Raw Coal Conveyor 1979 42"conveyor for raw coal from Cameo Mine. Removed <br /> 2002. <br /> RN7 T13-1-1 Rev 10/17 <br />