Laserfiche WebLink
17-2 <br />5 <br />Salinity Report <br />18-1 <br />5 <br />BLM Consent for Monitoring on Jerry Creek and Coal Canyon <br />20-1 <br />6 <br />Protective Pillar Design for Ute Water Property <br />20-2 <br />6 <br />Angle of Draw Observations <br />20-3 <br />6 <br />Pillar Design Analysis <br />20-4 <br />6 <br />Subsidence Prediction <br />20-5 <br />6 <br />Colorado Ute Transmission Line Subsidence Predictions <br />20-6 <br />6 <br />Colorado Ute Notice to Proceed with Transmission Line Construction <br />20-7 <br />6 <br />Public Service of Colorado Transmission Line Reservations <br />20-8 <br />6 <br />Consequences of Subsidence on Powerlines <br />20-9 <br />6 <br />TransColorado Gas Transmission Company Letter Agreement <br />20-10 <br />6 <br />Division's Approval to Suspend Monitoring <br />21-1 <br />6 <br />Colorado Division of Mines Production Records January thru July 1977 <br />21-2 <br />6 <br />Assessment of Alluvial Valley Floor Issues Unit Train Loadout Site <br />21-3 <br />6 <br />Reconnaissance Level Alluvial Valley Floor Investigation of the Rapid & <br />Cottonwood Creek Area <br />21-4 <br />6 <br />Reconnaissance Level Alluvial Valley Floor Investigation-Powderhorn <br />Mine & Adjacent Area <br />21-5 <br />6 <br />Stream Flow Water Yield for Irrigation <br />21-6 <br />6 <br />First Amended and Restated Agreement Between General Exploration <br />Company & Mississippi Power Company <br />TR -69 ix Rev 12/16 <br />