My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-05_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2018-03-05_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2021 12:57:48 PM
Creation date
3/5/2018 11:18:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/5/2018
Doc Name
Request for Technical Revision
From
Climax Molybdenum Company
To
DRMS
Type & Sequence
TR27
Email Name
ECS
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Quality Monitoring Plan Climax Molybdenum Company <br /> Version R4 Permit No M-1977-493 <br /> consider potential sources or causes of the trend, and if necessary develop a plan for increased monitoring <br /> frequency or further actions. <br /> 5.2.2.2 Outlier Identification <br /> Outlier results can and do occur in environmental monitoring. The general practice will be to not remove <br /> outliers from the water-quality database, but to consider them in the visual and statistical trend evaluations. <br /> However, Climax will perform outlier testing using Rosner's outlier or other applicable test, considering the <br /> size of the available sample set and the validity of statistical tests for the circumstance, and report the <br /> results in its annual monitoring report. Test results identified as"outlier'will be maintained in the monitoring <br /> database, but may be excluded in trend or statistical analyses. <br /> 5.2.2.3 Notification and Consultation <br /> Upon determination that declining quality trends are being observed, Climax will notify DRMS of the <br /> evaluation findings. Climax will consult with the DRMS to determine the appropriate actions to be taken. <br /> 5.3 Reporting <br /> Climax will report all data collected and the results of data analyses performed under this monitoring plan <br /> in its Annual Reclamation Report to DRMS. <br /> EPP—Appendix C March 2018 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.