Laserfiche WebLink
Water Quality Monitoring Plan Climax Molybdenum Company <br /> Version R4 Permit No M-1977-493 <br /> consider potential sources or causes of the trend, and if necessary develop a plan for increased monitoring <br /> frequency or further actions. <br /> 5.2.2.2 Outlier Identification <br /> Outlier results can and do occur in environmental monitoring. The general practice will be to not remove <br /> outliers from the water-quality database, but to consider them in the visual and statistical trend evaluations. <br /> However, Climax will perform outlier testing using Rosner's outlier or other applicable test, considering the <br /> size of the available sample set and the validity of statistical tests for the circumstance, and report the <br /> results in its annual monitoring report. Test results identified as"outlier'will be maintained in the monitoring <br /> database, but may be excluded in trend or statistical analyses. <br /> 5.2.2.3 Notification and Consultation <br /> Upon determination that declining quality trends are being observed, Climax will notify DRMS of the <br /> evaluation findings. Climax will consult with the DRMS to determine the appropriate actions to be taken. <br /> 5.3 Reporting <br /> Climax will report all data collected and the results of data analyses performed under this monitoring plan <br /> in its Annual Reclamation Report to DRMS. <br /> EPP—Appendix C March 2018 28 <br />