My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-05_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2018-03-05_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/15/2021 12:57:48 PM
Creation date
3/5/2018 11:18:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
3/5/2018
Doc Name
Request for Technical Revision
From
Climax Molybdenum Company
To
DRMS
Type & Sequence
TR27
Email Name
ECS
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Quality Monitoring Plan Climax Molybdenum Company <br /> Version R4 Permit No M-1977-493 <br /> Based on the evaluation of baseline monitoring data, the indicator parameter list for surface water <br /> monitoring at Climax is in Table 4-5. <br /> Table 4-5-Indicator Parameters for Surface Water Monitoring <br /> Indicator Parameters <br /> Cadmium,dissolved Molybdenum,total recoverable <br /> Copper,dissolved Zinc,dissolved <br /> Iron,dissolved pH <br /> Iron,total recoverable Sulfate(SO4) <br /> Manganese,dissolved Total Dissolved Solids(TDS) <br /> Molybdenum,dissolved Hardness <br /> 4.2 Monitoring Schedule <br /> All groundwater and internal surface water monitoring locations under this WQMP will continue to be <br /> monitored for indicator parameters quarterly, weather and access conditions permitting. Ongoing surface <br /> water monitoring of the East Fork Arkansas River and the East Fork Eagle River will be performed semi- <br /> annually, to collect data during high-flow and low-flow conditions. Concurrent monitoring will be conducted <br /> when possible at sampling stations on the East Fork Eagle River and the Eagle Park Reservoir outlet during <br /> periods of discharge from the reservoir. The Eagle Park Reservoir outlet generally releases water during <br /> winter months, November through March, but may also release water in late summer or fall. Climax will <br /> conduct concurrent sampling on the East Fork Eagle River and at the EPR Outlet at least once each year <br /> during the river low flow winter period. When possible, Climax will again concurrently sample these sites <br /> in the late summer or early fall if water is released from the reservoir. <br /> EPP—Appendix C March 2018 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.