Laserfiche WebLink
Colowyo Coal Company <br />2017 Annual Reclamation and Hydrology Report <br />Figure 6-2 — Topsoil Movements During Report Period <br />Topsoil Stripping <br />Topsoil Replacement <br />Topsoil <br />Task <br />Activity <br />Placement Area <br />1 <br />Removed Topsoil from Collom Haul Road <br />Piles 22A, 21A, <br />1 <br />(WP024) <br />21B,20A,25A <br />Removed Topsoil from Temporary Facilities <br />Windrow 8, Piles <br />2 <br />Area, Jubb Creek Access Road, Temporary <br />21D, 21C, 21B, <br />Facilhes Pond, and Wilson Storage Pond <br />and 21A <br />Removed Topsoil from Collom Facilities Area, <br />3 <br />East Side Access Roads, Section 36 Pond, Middle <br />Pile 25A <br />4 <br />Moved Topsoil from 16B to 16D <br />Pile 16B <br />Topsoil Replacement <br />Areas Exempt from Topsoil Stripping Due to Conditions <br />Task Activity Acres Exempt <br />Note: Refer to Exhibit 5A & 5B for location of stripping and replacement areas <br />Page 49 <br />Topsoil Pile <br />Task <br />Activity <br />Mined <br />Replaced Topsoil on West Pit reclmation area <br />1 <br />(WP024) <br />Pile 15B <br />Replaced Topsoil on West Pit Reclaim area <br />2 <br />Pile 15B <br />(WP025) <br />Replaced Topsoil on East Pit Reclaim area <br />3 <br />Pile 16B <br />(EP060) <br />Areas Exempt from Topsoil Stripping Due to Conditions <br />Task Activity Acres Exempt <br />Note: Refer to Exhibit 5A & 5B for location of stripping and replacement areas <br />Page 49 <br />