Laserfiche WebLink
Colowyo Coal Company <br />2017 Annual Reclamation and Hydrology Report <br />Figure 3-4 — South Taylor Fill (West Taylor) Quarterly Inspection Report <br />Continued <br />INSPECTION REPORT - SOUTH TAYLOR FILL <br />(Including Both the East Taylor and West Taylor Fill Segments) <br />INDICATE QUARTER I$To 2ND ❑ 3RD 0 4TH X 2017 <br />YEAR <br />ALL QUARTERS NEED TO BE CERTIFIED t <br />THE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPORTED AS NOTED: <br />1) Has any significant change been noted in the survey monuments on the fill? <br />No NA Yes <br />If yes, explain: <br />Date of Survey' NA <br />Reviewed By: Lee Sampson. Kurt Blunt <br />2) Has any significant change been noted in the water level found in the fill monitoring <br />well? <br />No X Yes Measured Level 223.9 feet If yes, explain: <br />Date of Measurement: 12-12-17 <br />Measured By: Lee Sampson, Kurt Blunt <br />3) Has there been any evidence of surficlal slope failure on the face of the fill? <br />No X Yes <br />If yes, explain - <br />Date of P.E. Inspection 12-12-17 <br />Inspected By: Lee Sampson, Kurt Blunt <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of Inspection: 12-12-17 <br />Inspected By: Lee Sampson, Kurt Blunt <br />47031 <br />12 49-1-7 , <br />1 am a Registered Professional Engineer in the State of Colorado Being familiar with the Colowyo operation, and relying on the <br />information provided to me by Colowyo Personnel, the West and East Taylor Fill are observed to be stable, at the time of inspection. <br />Construction activities related to the West and East Taylor Fill are in conformance, to the best of my knowledge and experience, as <br />specified in the Introductory pages and the associated report found in Volume 13, Exhibit 21, Item 1, and other applicable <br />requirements of the approved permit documents, a portion of CDRMS Permit C-1981-019. <br />Page 43 <br />