Laserfiche WebLink
Colowyo Coal Company <br />2017Annual Reclamation and Hydrology Report <br />Figure 3-4 — South Taylor Fill (West Taylor) Quarterly Inspection Report <br />INSPECTION REPORT -- SOUTH TAYLOR FILL <br />(Including Both the East Taylor and West Taylor Fill Segments) <br />INDICATE QUARTER IST X 2"D ❑ 3RD ❑ 4TH ❑ 2017 <br />YEAR <br />*ALL QUARTERS NEED TO BE CERTIFIED <br />THE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPORTED AS NOTED: <br />1) Has any significant change been noted in the survey monuments on the fill? <br />No NA Yes <br />If yes, explain: <br />Date of Survey: NA <br />Reviewed By: Lee Sampson. Kurt Blunt <br />2) Has any significant change been noted in the water level found in the fill monitoring <br />well? <br />No X Yes Measured Level 201.4 feet If yes, explain: <br />Date of Measurement: 3-24-17 <br />Measured By: Lee Sampson. Kurt Blunt <br />3) Has there been any evidence of surficial slope failure on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of P.E. Inspection: 3-24-17 <br />Inspected By: Lee Sampson. Kurt Blunt <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No X Yes <br />If yes, explain: <br />Date of Inspection: 3-24-17 <br />Inspected By: Lee Sampson, Kurt Blunt <br />Page 40 <br />