My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-02_REVISION - M1984076
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984076
>
2018-03-02_REVISION - M1984076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:08 PM
Creation date
3/2/2018 3:16:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984076
IBM Index Class Name
Revision
Doc Date
3/2/2018
Doc Name Note
Request for Technical Revision
Doc Name
Request for Technical Revision
From
General Shale Brick, Inc.
To
DRMS
Type & Sequence
TR4
Email Name
PSH
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0010 <br />General Shale <br />Building The American Dream <br />February 27, 2018 <br />Colorado Division of Reclamation, Mining, and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Attention: Mr. Peter S. Hays <br />Re: Technical Revision M-1984-076 DDD Mine, Elbert County, Colorado <br />Dear Mr. Hays: <br />On November 30, 2017, the Division conducted an inspection of the DDD Mine operated by General <br />Shale Brick, Inc. (GSB). The Division is requesting changes to the following in Stage 1A, known at the <br />DWR Mine, with a technical revision: <br />1. Update the Mine Plan for the relocation of the access road from the west portion to the middle <br />portion of the site <br />Please see revised map exhibit D -1A for location of the old and new entrances. <br />2. Increase the maximum allowed disturbance acreage <br />• The current disturbed acreage for the DEB Mine is incorrect. The acreage should be <br />23.20 acres. The confusion comes from the reclaimed area acreage of 3.1 acres, which <br />is already included in the moderate disturbance calculations. <br />• Proposed maximum disturbed acreages are as follows: <br />3. Include the new stonnwater detention pond located in the east portion of the site <br />• Please see revised map exhibit D-1 A for location of the east stormwater pond named <br />Boston's Stock Pond. <br />• Please see revised map exhibit F -1A for location of the east stormwater pond named <br />Boston's Stock Pond that will remain after reclamation is complete. <br />2016 TR -03 2018 Proposed <br />Disturbed Disturbed <br />Acres Acres <br />DEB Mine <br />26.00 25.00 <br />DWR Mine <br />34.00 43.00 <br />Grand Total <br />60.00 68.00 <br />3. Include the new stonnwater detention pond located in the east portion of the site <br />• Please see revised map exhibit D-1 A for location of the east stormwater pond named <br />Boston's Stock Pond. <br />• Please see revised map exhibit F -1A for location of the east stormwater pond named <br />Boston's Stock Pond that will remain after reclamation is complete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.