Laserfiche WebLink
• <br />Table D-1. Statistical comparison of sample means based on 1979 production data <br />for range sites 1, 2, 3, 4 and 5. (1) <br />Comparison of sample production means of range site 1 vs range site 2 (Table <br />D-2). <br />Ho: Range site 1 sample production mean = range site 2 sample production mean. <br />Ha: Range site 1 sample production mean = range site 2 sample production mean. <br />'CK,d.f. = t.05,15 = 2.131 <br />(A) S 2 d = Gd2i - (�di)2/n = 2,302.48 <br />n-1 <br />(B) to = X2 - Xl .9778 <br />S2di <br />n <br />to (.9778) < to,� (2.131), therefore cannot reject Ho. <br />Comparison of sample production means of range site 1 vs range site 3 (Table <br />D-2). <br />Ho: Range site 1 sample production mean = range site 3 sample production mean. <br />Ha: Range site 1 sample production mean = range site 3 sample production mean. <br />t--,,d.f. = t.05,15 = 2.131 <br />(A) S 2 d = 935.41 <br />(B) t = 3.6908 <br />n <br />to (3.6908) > tc� (2.131), therefore reject Ho. <br />Comparison of sample production means range site 4 vs range site 5 (Table <br />D-2). <br />Ho: Range site 4 sample production mean = range site 5 sample production mean. <br />Ha: Range site 4 sample production mean = range site 5 sample production mean. <br />to,,,d.f. = t.05,26 = 2.056 <br />Cont'd. next page. <br />D-1 <br />T <br />