My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-27_REVISION - M1995095
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995095
>
2018-02-27_REVISION - M1995095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:54:20 PM
Creation date
2/27/2018 3:01:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995095
IBM Index Class Name
REVISION
Doc Date
2/27/2018
Doc Name Note
Request for Technical Revision
Doc Name
Request for Technical Revision
From
Henry A. Schuler, Schuler Terracing Co.
To
DRMS
Type & Sequence
TR1
Email Name
TC1
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TC1 WHE <br /> COLORAD( M-1995-095 TRO1 ►TION, MINING AND SAFETY <br /> /g76 1313 Sh d Annual Fee/Report CW 1313 80203 ph(303)866-3567 <br /> d No Violations RECEIVED <br /> REOUEST FOR TECHNICAL REVISION(TR)COVER SHEET FEB 2ti <br /> File No.: M- 1995095 Site Name:Simla Highway Pit <br /> emstettemetAMM <br /> County El PasoV : y �;:,�..:, �.sr'� <br /> TR# 1 (DRMS Use onl ) <br /> Permittee: Henry A. Schuler, Schuler Terracing Co. P. `(1ro�R <br /> Operator(If Other than Permittee): <br /> Permittee Representative: Randy L. Malcom 24-6.,. <br /> Please provide a brief description of the proposed revision: <br /> Removing pit entryway, and adjoining access road to the south, from area to be reclaimed. <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this defmition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type-Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 7 <br /> 112 hard rock(not DMO) $175 ri <br /> 110d, 112d(1,2 or 3) $1006 Fl <br />
The URL can be used to link to this page
Your browser does not support the video tag.