Laserfiche WebLink
ATCOLORADO <br />Division of Water Resources <br />Department of Natural Resources <br />Office of the State Engineer <br />1313 Sherman 5t, Suite 818 <br />Denver, CO 80203 <br />Response to Reclamation Permit Partial Release Request Consideration <br />DATE: February 27, 2018 <br />TO: Timothy A. Cazier, Environmental Protection Specialist <br />CC: Division 2 Office; Dis rO Water Commissioner <br />FROM: Ivan Franco, P.E. <br />RE: Daniels Sand Pit 2, File No. M -1973 -007 -SG (AR02) <br />Operator: Continental Materials Corporation <br />Contact: Continental Materials Corporation (719) 475-0700 <br />Sec. 2, Twp. 15S, Rng. 66W, 61' P.M., El Paso County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, <br />exposure of ground water must not occur during or after mining operations. If <br />stormwater is contained on-site, it must infiltrate into the ground or be released to <br />the natural stream system within 72 hours, or all work must cease until a substitute <br />water supply plan, or augmentation plan approved by water court, is obtained. <br />Reclamation plans must ensure water will not be retained onsite for more than 72 <br />hours unless an augmentation plan approved by water court is obtained. <br />COMMENTS: N/A <br />1313 Sherman Street, Room 821, Denver, CO 80203 P 303.866.3581 F 303.866.3589 www. water. state. co. us <br />