Laserfiche WebLink
Other Reclamation Permits held by Prospective Successor (if applicable): 1 °d � <br />M1978357, M2010016, M1981243, M1980085, M1991079, M2002119, <br />�( 7 <br />M2000030, M 1999025, M1980080, M1979089, M1999076, M1998105, M1987064, <br />4 M 1987444, M198616-5 M1978166, M 1995034 M2009048, M 1980131 <br />DESIGNATION OF REVIEW TIMELINE <br />As explained above, the Permittee and Prospective Successor may waive their right to receive a <br />decision on an Application within 30 days in order to allow the Division to calculate the required <br />Financial Warranty before issuing its decision. Permittee and Prospective Successor must initial <br />one of the following two options to designate their choice. If Permittee and Prospective <br />Successor cannot agree, the Division will render its decision within 30 days. <br />Permittee <br />Prospective Successor <br />"e i <br />e <br />Prospective Successor <br />I have reviewed the information provided in this Application <br />Packet, as well as the applicable Act and Rules. Having been fully <br />informed, I wish to WAIVE MY RIGHT TO A DECISION ON <br />MY APPLICATION WITHIN 30 DAYS. <br />I have reviewed the information provided in this Application <br />Packet, as well as the applicable Act and Rules. Having been fully <br />informed, I wish to MAINTAIN MY RIGHT TO A DECISION <br />ON MY APPLICATION WITHIN 3Q DAYS. <br />The Prospective Successor must provide an adequate Financial Warranty or conditional <br />replacement Financial Warranty, consistent with the designation above. Hard Rock and <br />Construction Materials Rule 4.3 describes the various acceptable types of Financial Warranties. <br />Each Financial Warranty must be submitted on the Board's approved forms (available online at <br />htt :Ilminin .state.co.us/Mineral°/`2OForms.htm . <br />