Laserfiche WebLink
Colorado Division of Minerals and Geology <br />Annual Reclamation Report for the Year 2017 <br /> <br /> <br /> Bowie No. 1 Mine C-1981-038 Bowie Resources LLC <br />mine name permit # Permittee <br /> <br />Address: P.O. Box 1488, Paonia, CO. 81428 <br /> <br /> <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br /> <br />Land Status Category <br />Last Years <br />Cumulative Total <br /> This Calendar <br />Year <br /> <br />Cumulative Total 1 <br />Acres disturbed 156.10 + 0.00 = 156.10 <br />Acres backfilled and graded 95.72 + 3.28 = 99.00 <br />Acres topsoiled 91.27 + 0.00 = 91.27 <br /> <br /> <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final, Phase III release. <br /> Last Years <br />Cumulative <br />Total <br /> This <br />Calendar <br />year <br /> <br />Cumulative <br />Total 1 <br /> <br />10 years or <br />less <br /> Greater <br />than 10 <br />years 1 <br />Acres seeded* 102.69 + 3.28 = 105.97 = 51.68 + 54.29 <br />*include, if necessary, a description of any augmented seeding or cultural practices <br /> <br /> <br />For the Entire Life of Mine, the total number of acres disturbed 156.10 and the total number of acres: <br /> <br />Phase I released 63.68 Phase II released 72.5 Phase III released 0.00 <br /> <br /> <br />For Mines in Permanent Cessation: <br /> <br />Total acreage in facilities subject to reclamation but yet to be completed na <br /> <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities 2 0 <br /> <br />Acreage in active mining areas 3 0 <br /> <br />1 <br />(exclude acres where Phase III release has been achieved) <br /> <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br /> <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded