My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-26_REPORT - C1981038
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981038
>
2018-02-26_REPORT - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2018 12:58:01 PM
Creation date
2/27/2018 6:54:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Report
Doc Date
2/26/2018
Doc Name
Annual Reclamation Report
From
Bowie Resources, LLC
To
DRMS
Annual Report Year
2017
Permit Index Doc Type
Annual Reclamation Report
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2008 Reclamation Activities: <br />During the reporting year 2008, Bowie Resources LLC continued with the partial reclamation <br />of the Bowie No. 1 East Mine. (The 2008 reclamation is a continuation of the 2001 activities in <br />which surface structures were removed.) The 2008 reclamation consisted of returning portions of <br />the disturbed area back to approximate original contours and hydro seeding with a permanent seed <br />mix and wood fiber mulch. The following zones were completed during the 2008 reporting period. <br />(Reference attached Drawings "Reclamation Zones East Mines and "ROM Coal Stockpile Area") <br />Zones <br />Description <br />Acreage <br />Ton soiled <br />Reveaetated <br />Zone 1-A <br />Crushing & Screening Level Fill <br />Yes <br />Yes <br />2.64 <br />Zone 1-B <br />Shop & Warehouse Level Fill <br />Yes <br />Yes <br />3.08 <br />Zonel-D <br />Substation Level Fill <br />Yes <br />Yes <br />0.36 <br />Zone 2-B <br />Portal Level Fill <br />No <br />No <br />Zone 3-A <br />Diversion Channel Cut <br />Yes <br />Yes <br />Zone 3-B <br />Diversion Channel Cut <br />Yes <br />Yes <br />Zone 3-C <br />Diversion Channel Cut <br />Yes <br />Yes <br />5.48 (Total) <br />Zone 4-A <br />Rock Cut above Crushing & Screening <br />Yes <br />Yes <br />2.64 <br />Zone 4-D <br />Rock Cut below Fan Level <br />No <br />Yes <br />3.50 <br />Zone 5-A <br />Waste Rock Disposal Site <br />Yes <br />No <br />0.82 <br />Zone 6-A <br />R.O.M. Coal Stockpile & Access Road <br />Yes <br />Yes <br />11.16 <br />Totals <br />29.82 <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.