My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-26_REVISION - C2010089
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2018-02-26_REVISION - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2018 12:38:51 PM
Creation date
2/26/2018 10:02:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
2/26/2018
Doc Name
Application
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Type & Sequence
MR24
Email Name
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRI-STATE GENERATION AND TRANSMISSION ASSOCIATION, INC. <br />HEADQUARTERS: P.O. BOX 33695 DENVER, COLORADO 80233-0695 303-452-6111 <br />February 23, 2018 <br />Mr. Brock Bowles <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety n <br />1313 Sherman Street, Room 215 R��� v �' <br />Denver, CO 80203 J0 <br />FE8 2 <br />RE: New Horizon North Mine (Permit No. C-2010-089) at�or. <br />Minor Revision No. 24 (MR -24) o� Resa{ ty <br />Topsoil Redistribution Plan Mjjj"'( & <br />Dear Mr. Bowles: <br />Tri-State Generation and Transmission Association (Tri-State) is submitting the enclosed <br />"Application Form for a Revision to a Coal Mining and Reclamation Permit" for a minor <br />revision application on behalf of Elk Ridge Mining and Reclamation's (ERMR) New Horizon <br />North Mine. Tri-State is the parent company of ERMR. The New Horizon North Mine operates <br />under the Division of Reclamation, Mining and Safety (DRMS) Permit No. C-2010-089. <br />MR -24 revises Map 2.05.4(2)(d)-2 to include a topsoil redistribution plan in accordance <br />with Rule 4.06.3(2)(b). MR -24 also updates topsoil stockpile locations and changes the name of <br />the map to Topsoil and Overburden Stockpiles with Topsoil Redistribution Plan. <br />Also enclosed please find a revision application and a change of index sheet to ease <br />incorporation of these materials in to the permit. If you have any questions about the enclosed <br />technical revision, please contact Tony Tennyson at (970) 824-1232 or ttennyson(a,tristategt.org. <br />DJC:JSS:der <br />Enclosures <br />cc: Frank Ferris (via email) <br />Chris Gilbreath (via email) <br />Jason Storey (via email) <br />Tony Tennyson (via email) <br />File: G474 -11.3(21)c-5 <br />AN EQUAL OPPORTUNITY/AFFIRMATIVEACTION EMPLOYER <br />A Touchstone Energy'Cooperative <br />Sincerely, <br />Daniel J. Cas 'o <br />Senior Manager <br />Environmental Services <br />CRM STATION EV—M AM STATION NUCLA STATION <br />P.O. BOX 1807 P.O. KW 577 P.O. XOX 69X <br />CRAIG, CO 116261807 Ntra . NM aas NUCL& CO 81424 -OM <br />970.124-/11 506-!)2-3200 570-164.MG <br />
The URL can be used to link to this page
Your browser does not support the video tag.