My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-22_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-02-22_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 10:39:32 AM
Creation date
2/22/2018 10:18:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
2/22/2018
Doc Name Note
CPWs response
Doc Name
Comment
From
Colorado Parks and Wildlife
To
DRMS
Type & Sequence
TR119
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C��.OR�gOo <br />y�ry �'Fw <br />co �'fs,� oma• <br />February 22, 2018 <br />Mr. Zach Trujillo <br />COLORADO <br />Parks and Wildlife <br />Department of Natural Resources <br />Meeker Service Center <br />PO Box 1181, 73485 Highway 64 <br />Meeker, CO 81641 <br />P 970.878.6090 1 F 970.878.6079 <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety (CDRMS) <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Colowyo Coal Mine Haul Road A redesign Technical Revision No. 119 (TR -119) <br />Dear Mr. Trujillo: <br />Thank you for giving Colorado Parks and Wildlife (CPW) an opportunity to comment on the <br />proposed widening of the existing Haul Road A that is associated with the South Taylor Pit and <br />the Cullom Pit. <br />It is our understanding that, if approved, Colowyo Coal Mine will increase the width of the <br />existing Haul Road A that connects the South Taylor Pit to the Collom Pit in order to <br />accommodate large mining equipment. Haul Road A is an existing road that runs from the mine <br />facility area down to the Gossard Loadout, and this route is approximately 16,837 feet in length. <br />The approved width of the existing road is approximately 40 feet. If approved, the width of Haul <br />Road A would increase from 40 feet to 70 feet. Construction activities will most likely begin in <br />the spring or summer of 2018 pending CDRMS's approval. <br />CPW has worked collaboratively with the Office of Surface Mining Reclamation and <br />Enforcement (OSMRE) and Colowyo Mine to develop site-specific mitigation that will help <br />reduce, minimize or avoid impacts to wildlife and wildlife habitat associated with this project. <br />These mitigation practices have been documented via other correspondence documents with <br />OSMRE, and CPW believes that the proposed widening of the existing haul road falls within the <br />scope of anticipated impacts that were considered and included in these documents. <br />CPW appreciates the opportunity to provide comments for Technical Revision No. 119. For <br />additional information, please contact Brett Smithers, Land Use Specialist at 970-878-6069. <br />Sincerely, <br />Bill deVergie, Area Wildlife Manager <br />Cc: Evan Jones, District Wildlife Manager, Craig South <br />Brett Smithers, Land Use Specialist, Northwest Regional Office <br />Bob D. Broscheid, Director, Colorado Parks and Wildlife • Parks and Wildlife Commission: Robert W. Bray • Marie Haskett • Carrie Besnette Hauser �e <br />John Howard, Chair • Marvin McDaniel • Dale Pizel • Jim Spehar • James Vigil, Secretary • Dean Wingfield • Michelle Zimmerman, Vice -Chair • Alex Zip <br />•r <br />' 1876 <br />
The URL can be used to link to this page
Your browser does not support the video tag.