My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-20_HYDROLOGY - C2010089
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C2010089
>
2018-02-20_HYDROLOGY - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2018 7:15:57 AM
Creation date
2/22/2018 7:08:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Hydrology
Doc Date
2/20/2018
Doc Name
Quarterly Sediment Pond/Impoundment Report
From
Tri-State Generation and Transmission Association, Inc
To
DRMS
Annual Report Year
2018
Report Quarter_Month
1
Permit Index Doc Type
Sediment Pond Inspections
Email Name
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POND EXAMINATION FORM, 1st QUARTER 2018 <br />Mine: New Horizon North Mine <br />Pond Name: Pond 001 <br />NPDES Permit & Outfall #s: CO -850062 <br />Date Examined: 25 -January -2018 <br />Location Description: 2.4 miles NW of Nucla <br />Circle or Write appropriate Response <br />Owner's Rep.: Frank Ferris, Mine Manager <br />Pond Type: Partly Incised <br />CDRM & S #: C-2010-089 <br />Date Last Examined: 21 -August -2017 <br />Legal Location: Sec 25 of T47N R16W <br />Inspector's Name: Frank Ferris <br />1. <br />Seepage (specify location, color, and approx. volume) <br />Yes <br />1JI( <br />N/A <br />2. <br />Cracks or scarps on crest or slopes <br />Yes <br />% <br />N/A <br />3. <br />Sloughing or bulging on slopes <br />Yes <br />Iy <br />N/A <br />4. <br />Major erosion problems <br />Yes <br />N/A <br />5. <br />Surface movements in valley bottom or on hillside <br />Yes <br />N/A <br />6. <br />Water impounded against toe <br />Yes <br />N/A <br />7. <br />Clogging <br />a) Spillway channels and pipes <br />Yes <br />y <br />N/A <br />b) Decant system <br />Yes <br />f� <br />N/A <br />C) Diversion Ditches <br />Yes <br />N/A <br />8. <br />Cracking or crushing of pipes <br />a) Spillway pipes <br />Yes <br />i <br />N/A <br />b) Decant system <br />Yes <br />�i <br />N/A <br />9. <br />Trash racks clear and in place <br />1 <br />No <br />N/A <br />10. <br />Monitoring instrumentation <br />)K <br />No <br />N/A <br />Comments: Most of pond bottom covered by water <br />F:\M\NH2\Environmental\Pond Inspections & Examinations\2018_01 1st Quarter Pond Examinations.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.