My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-21_REVISION - M2008017 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008017
>
2018-02-21_REVISION - M2008017 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:35:23 PM
Creation date
2/21/2018 3:24:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008017
IBM Index Class Name
Revision
Doc Date
2/21/2018
Doc Name Note
Application
Doc Name
Application
From
Broken Arrow Investments, LLC
To
DRMS
Type & Sequence
AM1
Email Name
ECS
WHE
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Derr Pit Project <br />DRMS 112 Permit Amendment <br />proposed mine site by Two Rivers Testing in October 2006. Groundwater monitoring <br />wells have been installed at the proposed mining site in all fifteen borings by Two Rivers <br />Testing. Monitoring data is attached for the monthly readings since the installation <br />occurred in October 2006. <br /> <br />During mining, the exposed surface area will include a recharge pond, planned to be at <br />the southeast corner of the property for maximum benefit to the alluvial groundwater <br />aquifer, and a recharge ditch on the south side of the pit that will be approximately <br />1,500 feet in length with a 5’ width. The recharge pond location and configuration may <br />vary during the mining and dewatering operations for observed impacts to the area <br />alluvial aquifer, monitored through the groundwater monitoring wells. The recharge <br />pond is planned to have a total surface area of approximately 0.55 acres and the <br />recharge ditch will have a total surface area of 0.2 acres. <br /> <br />To enable dry mining at the site, dewatering trenches will be constructed around the <br />perimeter of the pit in Phases 1 – 7. Typically, groundwater and storm water in the mine <br />pit operation will flow along the dewatering trenches, and surface flow by gravity to <br />collection basins. These flows will then be pumped into the southeast recharge pit some <br />70 to 90 ft vertically ‘above’ the collection basin in the mine bottom. During mining <br />operations, less than 0.4 acres of water is expected to be exposed in less than 3,000 <br />feet of 5’ to 6’ width dewatering trenches, at any one time in the mining operation. <br /> <br />Water Requirements <br /> <br />The annual consumptive use at this site during Phases 1 – 7 of the mining operation is <br />estimated to be approximately of 16.0 ac-ft and will result from evaporative losses and <br />moisture content of the material hauled off the site. Evaporative losses are dependent <br />on the exposed water surface area, which may vary throughout the mining operation as <br />discussed above. Exposed surface area at the Derr Pit will include groundwater <br />exposed in dewatering trenches, a recharge pond, and recharge ditches. <br /> <br />The maximum exposed surface area at the site during mining is estimated at 1.15 <br />acres. Total annual evaporative loss is the product of net annual evaporation and total <br />exposed groundwater surface area. Net annual evaporation is the difference between <br />gross annual evaporation and effective annual precipitation. <br /> <br />The NOAA Technical Report NWS 33, Evaporation Atlas for the Contiguous 48 United <br />States (U.S. Department of Commerce), was used to determine gross annual <br />evaporation. For this location, gross annual evaporation was estimated at 45 inches, or <br />3.75 feet. <br /> <br />The Western Regional Climate Center climatic data for the City of Greeley weather <br />station was used to estimate annual precipitation. For this station, the average annual <br />precipitation was reported as 14.06 inches. Effective annual precipitation was assumed <br />to be 70 percent of average annual precipitation and was calculated to be 0.82 ft. The
The URL can be used to link to this page
Your browser does not support the video tag.