Laserfiche WebLink
Table 1 <br />Maximum Bond Release Amounts per Rule 3.03.1(2) <br />East Mine <br />West Mine <br />Loadout Total <br />Phase 1- 60% $1,759,323.06 <br />$635,764.19 <br />$1,803,873.21 $4,198,960.46 <br />Phase 11 - 25 % $733,051.28 <br />$264,901.75 <br />$751,613.84 $1,749,566.87 <br />Phase III - 15° $439,830.77 <br />$158,941.05 <br />$450,968.30 $1,049,740.12 <br />Total $2,932,205.11 <br />$1,059,606.99 <br />$3,006,455.35 $6,998,267.43 <br />Table 2 <br />Proposed Release Under SL -06 <br />Phase I Released <br />through SL -06 <br />East Mine <br />West Mine <br />Loadout <br />$508,369.02 $519,440.13 $0.001 <br />Proposed <br />Released <br />% of <br />Acres Acreage <br />Proposed <br />Release <br />% of <br />Acres Acreage <br />Propose <br />d <br />Released <br />% of <br />Acres Acreage <br />Phase I <br />$42,223.75 <br />2.31 2.40% <br />$0.00 <br />0.00 0.00% <br />$0.00 <br />0.00 0.00% <br />Phase II <br />$442,762.97 <br />58.84 60.40% <br />$0.00 <br />0.00 0.00% <br />$0.00 <br />0.00 0.00% <br />Based on the Division's review of the previous bond release decisions (SL -2, SL -3, SL -4, SL -5), the <br />Division has now determined that the amount of liability previously released was in excess of the <br />amounts allowed by Rule 3.03.1(2). A comparison of previously released amounts relative to the <br />maximum amounts allowed is shown in Table 3. <br />The maximum release amount for SL -2 was based on the $6,879,590.12 RN -4 total. With the approval <br />of SL -2, the Division granted Phase I release on 13.1 acres and approved the release of $709,004.00. <br />However, the release total should have been no more than $473,199.29 (74.43% (13.1 acres/17.6 acres) <br />of 60% of the original RN -4 liability for the West Mine of $1,059,606.99). Therefore, the Division <br />"over -released" $235,804.71 ($709,004.00 - $473,199.29) when it approved SL -2. <br />With the approval of SL -3 and SL -4, the Division released $1,713,346.70. However, the total release <br />amount associated with the SL -3 and SL -4 approvals should have been no more than $1,204,977.69 <br />(71.38% (40.15 acres/56.24 acres) of 60% of the original RN -4 liability for the East Mine of <br />$2,813,527.80). Therefore, SL -3 and SL -4 "over -released" atotal of $508,369.01 ($1,713,346.70 - <br />$1,204,977.69). <br />Table 3 <br />Comparison of Previously Released Liability Amounts to Maximum Allowable <br />Phase I Released <br />through SL -06 <br />Amount <br />Amount Phase II Previously <br />Previously Over- Release Over- <br />Released through SL -06 Released <br />Amount <br />Phase III Previously <br />Released Over - <br />through SL -06 Released <br />East Mine $1,755,570.451 <br />$508,369.02 $519,440.13 $0.001 <br />$0. 001 NA <br />West Min $709,004.00 <br />$235,804.71 $197,166.37 $0.00 <br />$0.00 NA <br />Loadout $1,136,354.00 <br />$0.00 $0.00 NA <br />$0.00 NA <br />Permit Number C-1981-038 Page 9 of 11 <br />