My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-15_REVISION - C1981038 (14)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2018-02-15_REVISION - C1981038 (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2018 12:55:00 PM
Creation date
2/21/2018 12:52:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
2/15/2018
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
SL6
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR GRADER WORK <br />Task description: FnishGrade Railroad Spur <br />Site: Bowie No. I Mne Permit Action: Bond Release 6 (SL -6) Permit/Job#: C1981038 <br />PROJECT IDENTIFICATION <br />Task#: <br />Date: <br />User: <br />208 State: Colorado Abbreviation: None <br />1/18/2018 County: Delta Filename: C038-208 <br />CCW <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Ripper Attachment: <br />Cost Breakdown: <br />CAT 14M <br />Ownership Cost/flour: <br />Operating Cost/Hour: <br />Ripper Ownership Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />MATERIAL OUANTITIES <br />DRM S <br />Horsepower: 259 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Utilization % <br />$54.68 NA <br />$46.99 100 <br />$0.00 NA <br />$0.00 <br />$28.90 NA <br />$130.57 <br />$130.57 <br />TotalArea to be graded orripped: 25.39 <br />Source ofestimated acreage: Map8-1 <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />Selected Application: <br />Selected Blade Angle: <br />Effective Blade Length: <br />Width ofblade overlap perpass: <br />Net grading orripping width perpass: <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />acres <br />1.50 <br />Finish grading <br />mph <br />(0-2.5 mph) - 1.5 <br />30 <br />degrees <br />12.10 <br />feet <br />2.00 <br />feet <br />10.10 <br />feet <br />1.8364 <br />acres/hour <br />Site Altitude: 7000 feet <br />Source <br />Altitude Adj: 1.00 CAT HB <br />Job Efficiency: 0.85 (lsh/d, mod.) <br />Net Correction: 0.8500 multiplier <br />Adjusted Hourly Unit Production: 1.5609 acres/Hour <br />AdjustedHourly Fleet Production: 1.5609 acres/Hour <br />JOB TIME AND COST <br />Fleet size: 1 <br />Grader(s) Totaljobtime: <br />16.27 Hours <br />Unit cost: $83.65 peracre Totaljobcost: $2,124 <br />CIRCES Cost Estimating So$ware <br />
The URL can be used to link to this page
Your browser does not support the video tag.