Laserfiche WebLink
Mobilization Worksheet Cont'd Task# 146 Page 3 of <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: GRAND JUNCTION <br />Totalone-way traveldistance: 90.00 miles <br />Average Travel Speed: 35.00 mph <br />TotalNon-Roadable Mob/Demob Cost <br />`* two round trips with haul rig: $42,136.69 <br />TotalRoadable Mob/Demob Cost * * $717.79 <br />* * one round trip, no haul rig: <br />Transportation Cycle Time: <br />JOB TIME AND COST <br />Totaljob time: 10.29 Hours <br />Totaljob cost: $42,854 <br />CIRCES Cost Estimating So$ware <br />Non- <br />Roadable <br />Roadable <br />Equipment <br />Equipmen <br />HaulTime (Hours): <br />2.57 <br />2.57 <br />Return Time (Hours): <br />2.57 <br />2.57 <br />Loading Time (Hours): <br />0.00 <br />NA <br />Unloading Time (Hours): <br />0.00 <br />NA <br />Subtotals: <br />5.14 <br />5.14 <br />JOB TIME AND COST <br />Totaljob time: 10.29 Hours <br />Totaljob cost: $42,854 <br />CIRCES Cost Estimating So$ware <br />