My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-15_REVISION - C1981038 (14)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2018-02-15_REVISION - C1981038 (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2018 12:55:00 PM
Creation date
2/21/2018 12:52:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
2/15/2018
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
SL6
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd <br />Task # 017 Page 2 of 2 <br />Operator Skill: <br />0.750 <br />(AVG.) <br />Material consistency: <br />0.900 <br />(CAT HB)) <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.800 <br />(FND-RF) <br />Push gradient: <br />0.786 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />0.793 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.2794 <br />Adjusted unit 138.95 LCY/hr <br />production: <br />Adjusted fleet 555.8 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $2.144/LCY <br />Total job time: 5.92 Hours <br />Total job cost: $7,052 <br />
The URL can be used to link to this page
Your browser does not support the video tag.