My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-15_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2018-02-15_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2018 12:34:44 PM
Creation date
2/21/2018 10:42:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
2/15/2018
Doc Name
Correspondence
From
Colorado Parks and Wildlife
To
DRMS
Type & Sequence
TR119
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/21/2018 State.co.us Executive Branch Mail - Fwd: TR-119 Haul Road A redesign <br />STATE OF DRMS_CoalAdmin - DNR, DNR <dnr drms_coal_admin@state.co.us> <br />is <br />COLORADO <br />Fwd: TR-119 Haul Road A redesign <br />1 message <br />Trujillo - DNR, Zach <zach.trujillo@state.co.us> Tue, Feb 20, 2018 at 2:18 PM <br />To: DNR DRMS_CoalAdmin - DNR <dnr—drms—coal—admin@state.co.us> <br />Attached is correspondence between CPW and the Division regarding Colowyo Mine's(C-1981-019) TR-119. Please do <br />not scan the attached map as it is a proposed map not yet approved. <br />Thanks, <br />---------- Forwarded message ---------- <br />From: Trujillo - DNR, Zach <zach.trujiIlo@state. co.us> <br />Date: Tue, Feb 20, 2018 at 2:17 PM <br />Subject: Re: TR-119 Haul Road A redesign <br />To: "Smithers - DNR, Brett" <brett.smithers@state.co.us> <br />Mr. Smithers, <br />Attached is Colowyo's proposed map for the revised Haul Road A. Haul Road A is an existing road that runs from the <br />mines facility area down to the Gossard Loadout and is a length of 16,837 feet. The approved width of the road is <br />approximately 40 feet and is being proposed to be widened an extra 30 feet for a total width of 70 feet. The additional <br />width to Haul Road A will run from the facility area down to the intersection with Haul Road B (access road from guard <br />shack/Highway 13 to Haul Road A). The total additional disturbance associated with TR -119 is 36 acres. Construction for <br />the proposed Haul Road A will most likely occur this coming spring or summer pending the Division's approval and <br />suitable weather. If you have any additional questions, feel free to contact me. <br />Sincerely, <br />On Tue, Feb 20, 2018 at 9:03 AM, Smithers - DNR, Brett <brett.smithers@state.co.us> wrote: <br />No problem, Zach. <br />Thanks, <br />B rett <br />On Tue, Feb 20, 2018 at 8:05 AM, Trujillo - DNR, Zach <zach.trujillo@state.co.us> wrote: <br />B rett, <br />Sorry, I was out of the office the final days of last week. I'll get this information out to you here today. <br />Sincerely, <br />On Fri, Feb 16, 2018 at 8:12 AM, Smithers - DNR, Brett <brett.smithers@state.co.us> wrote: <br />Good morning, Zach. <br />I actually don't need a map. Just need the other info. so I can include it in our letter as background info. <br />Thanks, and have a good weekend!! <br />B rett <br />On Thu, Feb 15, 2018 at 3:01 PM, Smithers - DNR, Brett <brett.smithers@state.co.us> wrote: <br />Hello, Zach. <br />When you have a minute, can you send me a map that shows Haul Road A that's referenced in TR -119. <br />Also, do you know the length of Haul Road A?? The approved width vs. the proposed width?? And how soon <br />will construction begin?? And ss Haul Road A an existing route?? <br />https://mail.google.com/mail/b/AKVXdwzSS3GFhuiMiFayiXVwYONa_zmA_oowV-OVgS3oywmaFmQg/u/O/?ui=2&ik=deb7fOcd20&jsver=nwJUtiz7310.e... 1/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.