Laserfiche WebLink
<br /> <br /> <br />19 - DEWATERING WELL PERMITS MUST BE IN PLACE, AND A MINOR REVISION <br />BE SUBMITTED AND APPROVED BY THE DIVISION TO UPDATE SECTION 2.03.10 <br />OF VOLUME 1 OF THE PERMIT APPLICATION P ACKAGE, BEFORE ANY <br />CONSTRUCTION OF ANY DEWATERING WELLS ASSOCIATED WITH THE <br />COLLOM PIT IS ALLOWED TO OCCUR. <br /> <br />20 - A DISCHARGE PERMIT FOR WATER PUMPED FROM THE DEWATERING <br />WELLS MUST BE IN PLACE, AND A MINOR REVISION TO THE PERMIT <br />SUBMITTED AND APPROVED BY THE DIVISION TO UPDATE SECTION 2.03.10 OF <br />VOLUME 1 OF THE PERMIT AP PLICATION PACKAGE, BEFORE ANY PUMPING <br />FROM WELLS ASSOCIATED WITH THE COLLOM PIT IS ALLOWED TO OCCUR. <br /> <br />23 - AN INDIVIDUAL DISCHARGE PERMIT MUST BE IN PLACE, AND A MINOR <br />REVISION TO THE PERMIT SUBMITTED AND APPROVED BY THE DIVISION TO <br />UPDATE SECTION 2.03.10 OF VOLUME 1 OF THE PERMIT APPLICATION <br />PACKAGE, BEFORE OVERBURDEN STOCKPILING WITHIN THE COLLOM <br />TEMPORARY SPOIL PILE (NOT INCLUDING TOPSOIL REMOVAL, SEDIMENT <br />POND DEVELOPMENT OR AC CESS/HAUL ROAD DEVELOPMENT) CAN OCCUR. <br /> <br />