My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-13_REVISION - M1992009
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992009
>
2018-02-13_REVISION - M1992009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:06 PM
Creation date
2/16/2018 9:00:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992009
IBM Index Class Name
Revision
Doc Date
2/13/2018
Doc Name Note
Request for Technical Revision
Doc Name
Request for Technical Revision
From
Chris Pyles
To
DRMS
Type & Sequence
TR7
Email Name
ERR
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ca:Kb „ <br />COLORADO DIVISION OF RECLAMATION MINING AND SAFETY <br />is7s <br />I%' 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br />REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br />File No.: M- 1992-0099 Site Name:G I Tette Pit <br />County Teller TR# DRMS Use only) <br />Permittee:Chris Pyles <br />ERR WHE <br />M-1992-009 TROT D <br />Operator(If Other than Permittee): J Annual Fee/Report: CW FEB 13 2018JNoViolations <br />Permittee Representative: <br />DIVISION OF RECLAMATIOr: <br />Please provide a brief description of the proposed revision: MININGANDSAFETY <br />Request to Revert back to 32 acres . On March 27 2017 an acreage of reduction of 1.28 acres was approved. <br />We feel this would complicate things by have the potentall of damage to these small areas in the working areas <br />of the pit .We would like to keep it as a reclaimed area with in the pit but not released. <br />As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan.” The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br />Division(as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type -Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Type Required TR Fee Submitted (mark only one) <br />110c, 111, 112 construction <br />materials, and 112 quarries 216 <br />112 hard rock(not DMO) 175 <br />110d, 112d(1, 2 or 3) 1006
The URL can be used to link to this page
Your browser does not support the video tag.