My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-15_PERMIT FILE - M2017036 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017036
>
2018-02-15_PERMIT FILE - M2017036 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2018 9:05:34 AM
Creation date
2/16/2018 8:00:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017036
IBM Index Class Name
Permit File
Doc Date
2/15/2018
Doc Name Note
Adequacy Review #3
Doc Name
Adequacy Review #3 Response
From
Telesto
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
287
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: Jared Ebert <br />Date: February 14, 2018 <br />Page 8 <br />Response 29a <br />The water management pond was sized in a two-step process involving the DSM and the <br />numerical groundwater model. The pond was first sized for operational requirements <br />utilizing the DSM. This pond (size and shape) was inserted into the numerical <br />groundwater model, and operations were simulated to calculate the rise in head required <br />to discharge the dewatering water back to the aquifer. Because of the high permeability <br />of the aquifer material, only a few feet of head in the pond above the surrounding <br />groundwater elevation is required to return the dewatering water. Simulation results for <br />the various mining phases are documented in Section 5 of the groundwater modeling <br />report. <br />The Little Cache Ditch is not lined through the site. However, the ditch company <br />performed a leakage analysis recently. They have indicated that the ditch leaks very little <br />through this section, indicating that natural siltation has likely sealed up the ditch. <br />Comment 29b <br />Section 6.3 states that approximately 1.5 feet of freeboard is required in the water <br />management pond to provide capacity to manage a 100 year storm event. Please commit <br />to enlarge the pond or install additional drain structures as detailed in the report if <br />freeboard in the water management pond drops below 1.5 feet. <br />Response 29b <br />LRM commits to enlarge the pond or install additional drain structures as detailed in the <br />report if freeboard in the water management pond drops below 1.5 feet. <br />Comment 35a <br />Is the Little Cache La Poudre Ditch that passes through the site lined? If not, how will <br />LRM prevent losses from the ditch during dewatering?If there is a potential for losses to <br />occur from the ditch, how will LRM monitor the inflow and outflow of the ditch to <br />measure these losses? Please provide a monitoring plan and either a mitigation plan or <br />loss prevention plan <br />Response 35a <br />The Little Cache Ditch is not lined through the site. However, the ditch company <br />performed a leakage analysis (measuring inflow and outflow up and down gradient of the <br />Response to DRMS Adequacy Review 3 comments T E L E S T O
The URL can be used to link to this page
Your browser does not support the video tag.